Feelin’ Blue coming together

I realized today that the deadline for the Marin show is fast approaching and I had better get the form filled out for this quilt, call the quilter, etc. I have sewn some of it, but not much. I planned to do little bits this week while W was gone, but haven’t made it so far.

I also need to make the templates and cut pieces for the 8 pointed star. My quilt class will be doing the 8 pointed star this week and I want to be able to show them how to do the joins. I need to take a look at Judy Martin’s Ultimate Rotary Cutting Reference Book to see how to use the Point Trimmer to make the diamonds easier to put together. I had a little trouble using the tool on my blocks for the Teacher Pillows, but perhaps I was in a rush?