Current Projects – October 2014

The title of this post is so boring I just don’t know if I can stand it. It says what it is and you can find it easily but there is nothing interesting in it at all. 26 Projects was a lot more interesting.

I can’t believe it is October. January-Febuary-March seem like they were yesterday and now we are full on in Fall and thinking seriously about Thanksgiving and Christmas. Yes, Halloween is in there, too.

Finished 2014 Quilt Projects

  1. Disappearing Pinwheel: finished 5/30/2014
  2. Fabric of the Year 2012: finished 4/24/2014
  3. Flower Sugar Hexagon: finished 7/1/2014
  4. Fresh Fruit: finished May 3/3/2014
  5. Infinity Quilt: finished 3/3/2014
  6. Scrapitude Carnivale: finished 6/3/2014
  7. See: finished 8/11/2014
  8. Spiderweb: finished 2/22/2014 WHEW!
  9. Star Sampler: finished 7/3/2014
  10. Wonky Nine Patch – finished 9/6/2014

Finished 2014 non-Quilt Projects

Still WIPs

I still have WIPs. Who doesn’t, after all, but the list is getting a lot smaller.

  1. Aqua-Red SamplerFrances and I haven’t really worked on this for a long time. I really want her to finish her hexagon block before we move on. I think she has progressed so much since we started that I wonder if I should just tell her how to put the quilt together and be done with it.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, I do think about it. The Lunns have a new line of PP fabric out. I am curious to see the new colors. I only saw a few at PIQF
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have been feeling like I need to finish this piece as it should be a good reminder for some other stuff going on in my life. Perhaps that will spur me on.
  5. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.

Ready for Quilting

Wow! Everything on this list is new, as in it was never on the original 26 Projects list.

  1. Fabric of the Year 2013: top, back and binding made; ready to take it to the quilter
  2. New:* Super Secret Project #4: at the quilter
  3. Table runner: Basted; needs quilting and binding. I am planning on free motion quilting this myself for practice, which may be a challenge when my main machine is not working. (Not on original list)

In the Finishing Process

Nothing at this time, which is kind of odd.

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on a project that is “In Process.”

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5″x4.5″ blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2″ squares
  • FOTY 2014: cutting out 3″x5″ rectangles.
  • Pink Gradation Quilt: cutting 2.5″x4.5″ pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I just remembered this project. It isn’t started, but I have all the pre-cuts and should think about actually using them.
  • Windmill quilt: Still hunting and gathering. I will use a grey for the background, because if I use more of the cut fabric patches, the pattern will be lost. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps

Abandoned

Nothing so far for 2014

You can find the last update for the Current Projects list provides a good comparison to this month.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made REALLY GOOD progress. Up until last month, I was still planning to stop this post when I had no more projects from the original list to write about, but now, that the end is in sight, I am not so sure. It is so useful to keep track of all of my projects. Since I still have some pretty old projects on the list, I don’t have to decide right now.

*New – Project started after I started working on the 26 Projects list

Current Projects – September 2014

Finished 2014 Quilt Projects

  1. Disappearing Pinwheel: finished 5/30/2014
  2. Fabric of the Year 2012: finished 4/24/2014
  3. Flower Sugar Hexagon: finished 7/1/2014
  4. Fresh Fruit: finished May 3/3/2014
  5. Infinity Quilt: finished 3/3/2014
  6. Scrapitude Carnivale: finished 6/3/2014
  7. See: finished 8/11/2014
  8. Spiderweb: finished 2/22/2014 WHEW!
  9. Star Sampler: finished 7/3/2014
  10. Wonky Nine Patch – finished 9/6/2014

Finished 2014 non-Quilt Projects

Still WIPs

I still have WIPs. Who doesn’t, after all, but the list is getting a lot smaller.

  1. Aqua-Red SamplerFrances and I are back at it regularly and I give Frances full credit as I have been letting her “drive the bus.” I did work on the hexagon tutorial as promised. It is ready to post, but I could have taken a few more photos and might still do that. If you look at it and think there are a paltry number of photos, check back.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, I did find a bunch of squares already made. That makes me hopeful.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece. I am working on printing images on fabric and looking at the shoulder fabric. I am still trying to decide about a mouth and I need to find some monsters. 😉
  5. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.

Ready for Quilting

Wow! Everything on this list is new, as in it was never on the original 26 Projects list.

  1. Fabric of the Year 2013: top, back and binding made; ready to take it to the quilter
  2. New:* Super Secret Project #4: at the quilter
  3. Table runner: Basted; needs quilting and binding. I am planning on free motion quilting this myself for practice, which may be a challenge when my main machine is not working. (Not on original list)

In the Finishing Process

Nothing at this time, which is kind of odd.

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on a project that is “In Process.”

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5″x4.5″ blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2″ squares
  • FOTY 2014: cutting out 3″x5″ rectangles.
  • Pink Gradation Quilt: cutting 2.5″x4.5″ pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I just remembered this project. It isn’t started, but I have all the pre-cuts and should think about actually using them.
  • Windmill quilt: Still hunting and gathering. I will use a grey for the background, because if I use more of the cut fabric patches, the pattern will be lost. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps

Abandoned

Nothing so far for 2014

You can find the last update for the Current Projects list provides a good comparison to this month.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made REALLY GOOD progress. Up until last month, I was still planning to stop this post when I had no more projects from the original list to write about, but now, that the end is in sight, I am not so sure. It is so useful to keep track of all of my projects. Since I still have some pretty old projects on the list, I don’t have to decide right now.

*New – Project started after I started working on the 26 Projects list

Current Projects – August 2014

Finished 2014 Quilt Projects

  1. Disappearing Pinwheel: Finished 5/30/2014
  2. Fabric of the Year 2012: Finished 4/24/2014
  3. Flower Sugar Hexagon: Finished 7/1/2014
  4. Fresh Fruit: Finished May 3/3/2014
  5. Infinity Quilt: Finished 3/3/2014
  6. Scrapitude Carnivale: Finished 6/3/2014
  7. See: Finished 8/11/2014
  8. Spiderweb: Finished 2/22/2014 WHEW!
  9. Star Sampler: Finished 7/3/2014

Finished 2014 non-Quilt Projects

Still WIPs

  1. Aqua-Red SamplerFrances and I are back at it regularly and I give Frances full credit as I have been letting her “drive the bus.” I did work on the hexagon tutorial as promised. It is ready to post, but I could have taken a few more photos and might still do that. If you look at it and think there are a paltry number of photos, check back.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, I did find a bunch of squares already made. That makes me hopeful.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece. I am working on printing images on fabric and looking at the shoulder fabric. I am still trying to decide about a mouth and I need to find some monsters. 😉
  5. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.

Ready for Quilting

Wow! Everything on this list is new.

  1. New:* Wonky 9 Patch: Basted; started quilting on 8/21. All orange blocks done and working on plain blue blocks, needs binding. (Not on original list)
  2. New:* Super Secret Project #4: at the quilter
  3. Table runner: Basted; needs quilting and binding. I am planning on free motion quilting this myself for practice, which may be a challenge when my main machine is not working. (Not on original list)

In the Finishing Process

Nothing at this time, which is kind of odd.

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on a project that is “In Process.”

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5″x4.5″ blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2″ squares
  • FOTY 2014: cutting out 3″x5″ rectangles.
  • Pink Gradation Quilt: cutting 2.5″x4.5″ pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I just remembered this project. It isn’t started, but I have all the pre-cuts and should think about actually using them.
  • Windmill quilt: Still hunting and gathering. I will use a grey for the background, because if I use more of the cut fabric patches, the pattern will be lost. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps

Abandoned

Nothing so far for 2014

You can find the last update for the Current Projects list provides a good comparison to this month.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made REALLY GOOD progress. Up until last month, I was still planning to stop this post when I had no more projects from the original list to write about, but now, that the end is in sight, I am not so sure. It is so useful to keep track of all of my projects. Since I still have some pretty old projects on the list, I don’t have to decide right now.

*New – Project started after I started working on the 26 Projects list

Current Projects – July 2014

Finished 2014 Quilt Projects

  1. Disappearing Pinwheel: Finished 5/30/2014
  2. Fabric of the Year 2012: Finished 4/24/2014
  3. Flower Sugar Hexagon: Finished 7/1/2014
  4. Fresh Fruit: Finished May 3/3/2014
  5. Infinity Quilt: Finished 3/3/2014
  6. Scrapitude Carnivale: Finished 6/3/2014
  7. Spiderweb: Finished 2/22/2014 WHEW!
  8. Star Sampler: Finished 7/3/2014

Finished 2014 non-Quilt Projects

Still WIPs

  1. Aqua-Red SamplerFrances and I are back at it regularly and I give Frances full credit as I have been letting her “drive the bus.” I did work on the hexagon tutorial as promised. It is ready to post, but I could have taken a few more photos and might still do that. If you look at it and think there are a paltry number of photos, check back.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, I did find a bunch of squares already made. That makes me hopeful.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece. I am working on printing images on fabric and looking at the shoulder fabric. I am still trying to decide about a mouth and I need to find some monsters. 😉
  5. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.

Ready for Quilting

Wow! Everything on this list is new.

  1. New:* Wonky 9 Patch: Basted; needs quilting and binding. I am planning on quilting this myself. (Not on original list)
  2. New:* Super Secret Project #4: at the quilter
  3. Table runner: needs quilting and binding. I am planning on quilting this myself. (Not on original list)

In the Finishing Process

  1. See: I finished the quilting! YAY!! Needs facing and sleeve

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on a project that is “In Process.”

Hunting and Gathering

  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I will use a grey for the background, because if I use more of the cut fabric patches, the pattern will be lost. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I just remembered this project. It isn’t started, but I have all the pre-cuts and should think about actually using them.
  • FOTY 2014: cutting out 3″x5″ rectangles.

Abandoned

Nothing so far for 2014

You can find the last update for the Current Projects list provides a good comparison to this month.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made REALLY GOOD progress. Up until last month, I was still planning to stop this post when I had no more projects from the original list to write about, but now, that the end is in sight, I am not so sure. It is so useful to keep track of all of my projects. Since I still have some pretty old projects on the list, I don’t have to decide right now.

*New – Project started after I started working on the 26 Projects list

Current Projects – June 2014

Six quilts finished this year already! Not the same as last year, but respectable.

As I look at these lists, I can hardly believe that some of the projects, which I now think of as old, were not even on the first list I made. Crazy.

Finished 2014 Quilt Projects

  1. Disappearing Pinwheel: Finished May 30, 2014
  2. Fabric of the Year 2012: Finished 4/24/2014
  3. Fresh Fruit: Finished May 3/3/2014
  4. Infinity Quilt: Finished 3/3/2014
  5. Scrapitude: Finished 6/3/2014
  6. Spiderweb: Finished 2/22/2014 WHEW!

Finished 2014 non-Quilt Projects

Still WIPs

  1. Aqua-Red SamplerFrances and I are back at it regularly and I give Frances full credit as I have been letting her “drive the bus.” I did work on the hexagon tutorial as promised. It is ready to post, but I could have taken a few more photos and might still do that. If you look at it and think there are a paltry number of photos, check back.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, I did find a bunch of squares already made. That makes me hopeful.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I like the piece, but don’t know where to go from where I am. Mouth? Hair? The attitude I need to have is that I can’t ruin it; there is always more fabric. Possibility for abandonment.
  5. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.

Ready for Quilting

Wow! Everything on this list is new.

  1. New:* Wonky 9 Patch: needs quilting and binding. I got some batting from Kelly for this since I am thinking about quilting this myself. (Not on original list)
  2. New:* Super Secret Project #4: at the quilter

In the Finishing Process

  1. See: I have quilted about a third of it, so 2/3 needs to be quilted. Needs facing and sleeve
  2. Flower Sugar Hexagon / Attack of the Hexies – Sewing on binding.
  3. New:*Star Sampler: Quilting finished and binding machine sewed on the front. I have to go pick it up and sew the binding down by hand (not on original list)

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on a project that is “In Process.”

Hunting and Gathering

  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I will use a grey for the background, because if I use more of the cut fabric patches, the pattern will be lost. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Super Secret Project #3: working on color choices.
  • FOTY 2014: cutting out 3″x5″ rectangles.

Abandoned

Nothing so far for 2014

You can find the last update for the Current Projects list provides a good comparison to this month.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made REALLY GOOD progress. Up until last month, I was still planning to stop this post when I had no more projects from the original list to write about, but now, that the end is in sight, I am not so sure. It is so useful to keep track of all of my projects. Since I still have some pretty old projects on the list, I don’t have to decide right now.

*New – Project started after I started working on the 26 Projects list

Current Projects – May 2014

Last month I said that I wasn’t sure I would finish as many quilts in 2014 as I did in 2013. Famous last words. I finished two quilt this month! I am still reminding myself that it is about the process and also about what I am learning, and sharing with you.

Finished 2014 Quilt Projects

  1. Fabric of the Year 2012: Finished 4/24/2014
  2. Fresh Fruit: Finished May 3/3/2014
  3. Infinity Quilt: Finished 3/3/2014
  4. Spiderweb: Finished 2/22/2014 WHEW!

Finished 2014 non-Quilt Projects

Still WIPs

  1. Aqua-Red SamplerFrances and I are back at it regularly and I give Frances full credit as I have been letting her “drive the bus.” I did work on the hexagon tutorial as promised. It is ready to post, but I could have taken a few more photos and might still do that. If you look at it and think there are a paltry number of photos, check back.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, I did find a bunch of squares already made. That makes me hopeful.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I like the piece, but don’t know where to go from where I am. Mouth? Hair? The attitude I need to have is that I can’t ruin it; there is always more fabric. Possibility for abandonment.
  5. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.

Ready for Quilting

Wow! Everything on this list is new.

  1. New:* Wonky 9 Patch: needs quilting and binding. I am thinking about quilting this myself and I am thinking about it more and more. I am wondering how far apart I can quilt it so that it has some drape? (Not on original list)
  2. New:*Star Sampler: Top finished, back and binding finished; at the quilter. (not on original list)

In the Finishing Process

  1. See: I have quilted about a third of it. Needs facing and sleeve
  2. Flower Sugar Hexagon / Attack of the Hexies – Top finished 1/12/2014: back from the quilter.
  3. New: * Scrapitude – Top, back and binding finished 2/24/2014: back from the quilter.
  4. New* Disappearing Pinwheel – Top, back finished 3/30/2014, back from the quilter.

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on a project that is “In Process.”

Hunting and Gathering

  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I will use a grey for the background, because if I use more of the cut fabric patches, the pattern will be lost. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Super Secret Project #3: working on color choices.

Abandoned

Nothing so far for 2014

You can find the  latest update for the Current Projects list provides a good comparison to this month.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made progress. I am still planning to stop this post when I have no more projects from the original list to write about, but it is so useful to keep track of all of my projects.

*New – Project started after I started working on the 26 Projects list

Current Projects – April 2014

I am not sure I will finish as many quilts in 2014 as I did in 2013, but I am pleased with the progress I am making. I have to remind myself that it is about the process and what I am learning and sharing with you. You never know. There are a lot of sewing days left in 2014. 😉

Finished 2014 Quilt Projects

  1. Infinity Quilt: Finished 3/3/2014
  2. Spiderweb: Finished 2/22/2014 WHEW!

Finished 2014 non-Quilt Projects

Still WIPs

  1. Aqua-Red SamplerFrances and I started up again! We talked about the New York Beauty and I promised to start the hexagon tutorial. It is ready to post, but I could have taken a few more photos and might still do that. If you look at it and think there are a platry number of photos, check back.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, every once in a while I think about using some of the squares as leaders and enders. I also want to find my notes for the others and see if I want to do them.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I like the piece, but don’t know where to go from where I am. Mouth? Hair? The attitude I need to have is that I can’t ruin it; there is always more fabric. Possibility for abandonment.
  5. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.

Ready for Quilting

  1. New:* Wonky 9 Patch: needs quilting and binding. I am still thinking about quilting this myself and I am thinking about it more and more. I am wondering how far apart I can quilt it so that it has some drape? (Not on original list)
  2. New:*Star Sampler: Top finished, back and binding finished; at the quilter. (not on original list)
  3. Flower Sugar Hexagon / Attack of the Hexies – Top finished 1/12/2014: at the quilter.
  4. New: * Scrapitude – Top, back and binding finished 2/24/2014: at the quilter.
  5. New* Disappearing Pinwheel – Top, back finished 3/30/2014, binding made; at the quilter

In the Finishing Process

  1. New:* FOTY 2012: Quilting complete, working on the binding and the sleeve
  2. New:* Fresh Fruit: Quilting complete, working on the binding and the sleeve
  3. See: finished fusing applique’ pieces and  satin stitching. Working on quilting. Needs binding and sleeve

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’. The difference is that I am actively working on a project that is “In Process.”

Hunting and Gathering

  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I will use a grey for the background, because if I use more of the cut fabric patches, the pattern will be lost. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Super Secret Project #3: working on color choices.

Abandoned

Nothing so far for 2014

You can find the  latest update for the Current Projects list provides a good comparison to this month.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made progress. I am still planning to stop this post when I have no more projects from the original list to write about, but it is so useful to keep track of all of my projects.

*New – Project started after I started working on the 26 Projects list

Current Projects – March 2014

A nice finish, though not one that made as much impact as the Attack of the Hexies.

Finished 2014 Quilt Projects

  1. Infinity Quilt: Finished 3/3/2014
  2. Spiderweb: Finished 2/22/2014 WHEW!

Finished 2014 non-Quilt Projects

Still WIPs

  1. Aqua-Red SamplerFrances and I started up again! We talked about the New York Beauty and I promised to start the hexagon tutorial. I did start it, I just haven’t done much since starting it.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, every once in a while I think about using some of the squares as leaders and enders. I also want to find my notes for the others and see if I want to do them.
  4. See: needs satin stitching. Small, also a possibility for finishing before the end of the year, though with all the cutting I have done recently, perhaps not so much.
  5. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I like the piece, but don’t know where to go from where I am. Mouth? Hair? The attitude I need to have is that I can’t ruin it; there is always more fabric. Possibility for abandonment.
  6. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.

Ready for Quilting

  1. New:* Wonky 9 Patch: needs quilting and binding. I am still thinking about quilting this myself and I am thinking about it more and more. I am wondering how far apart I can quilt it so that it has some drape? (Not on original list)
  2. New:* FOTY 2012: top, finished. Back and binding are complete; at the quilter.
  3. New:*Star Sampler: Top finished, back and binding finished; at the quilter. (not on original list)
  4. New:*Fresh Fruit: Top finished, back and binding finished; at the quilter. (not on original list)
  5. Flower Sugar Hexagons / Attack of the Hexies – Top finished 1/12/2014: at the quilter.

In the Finishing Process

None at this time.

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’. The difference is that I am actively working on a project that is “In Process.”

Hunting and Gathering

  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I will use a grey for the background, because if I use more of the cut fabric patches, the pattern will be lost. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Super Secret Project #3: working on color choices.

Abandoned

Nothing so far for 2014

You can find the  latest update for the Current Projects list provides a good comparison to this month.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made progress. I am still planning to stop this post when I have no more projects from the original list to write about, but it is so useful to keep track of all of my projects.

*New – Project started after I started working on the 26 Projects list

Current Projects-February 2014 (26 Projects)

I still really only have two “really old” UFOs left on my list – the Pointillist Palette and the Tarts Come to Tea. The others are old, but they have a different feel to me. I may be kidding myself, but that is what is in my head right now.

I am still kind of on a high about the Attack of the Hexies top. It is at the quilter and I feel like it will get done soon.

Finished 2014 Projects

  1. Spiderweb: Finished 2/22/2014 WHEW!

Still WIPs

  1. Aqua-Red SamplerFrances and I started up again! We talked about the New York Beauty and I promised to start the hexagon tutorial. I did start it, I just haven’t done much since starting it.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, every once in a while I think about using some of the squares as leaders and enders. I also want to find my notes for the others and see if I want to do them.
  4. See: needs satin stitching. Small, also a possibility for finishing before the end of the year, though with all the cutting I have done recently, perhaps not so much.
  5. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I like the piece, but don’t know where to go from where I am. Mouth? Hair? The attitude I need to have is that I can’t ruin it; there is always more fabric. Possibility for abandonment.
  6. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.

Ready for Quilting

  1. New:* Wonky 9 Patch: needs quilting and binding. I am still thinking about quilting this myself and I am thinking about it more and more. I am wondering how far apart I can quilt it so that it has some drape. (Not on original list)
  2. New:* FOTY 2012: top, finished. Back and binding are complete; at the quilter.
  3. New:*Star Sampler: Top finished, back and binding finished; at the quilter. (not on original list)
  4. New:*Fresh Fruit: Top finished, back and binding finished; at the quilter. (not on original list)
  5. Flower Sugar Hexagons / Attack of the Hexies – Top finished 1/12/2014: at the quilter.

In the Finishing Process

  1. Infinity blocks: Back from the quilter, sewing down binding.

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’. The difference is that I am actively working on a project that is “In Process.”

Hunting and Gathering

  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I will use a grey for the background, because if I use more of the cut fabric patches, the pattern will be lost. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Super Secret Project #3: working on color choices.

Abandoned

Nothing so far for 2014

You can find the  latest update for the Current Projects list provides a good comparison to this month.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made progress. I am still planning to stop this post when I have no more projects from the original list to write about, but it is so useful to keep track of all of my projects.

*New – Project started after I started working on the 26 Projects list

 

Current Projects – January Update (26 Projects)

I told you I was going to change this post to reflect the progress that I have made on the 26 Projects List. I really only have two “really old” UFOs left on my list – the Pointillist Palette and the Tarts Come to Tea. The others are old, but they have a different feel to me. I may be kidding myself, but that is what is in my head right now.

I am really pleased that I finished the Attack of the Hexies top and am feeling like I have made a huge leap forward.

Still WIPs

  1. Aqua-Red SamplerFrances and I are stalled. She has been talking about getting back to it. I am thinking about the next tutorial., because I can write it without her, though I am not that motivated.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, every once in a while I think about using some of the squares as leaders and enders.
  4. See: needs satin stitching. Small, also a possibility for finishing before the end of the year, though with all the cutting I have done recently, perhaps not so much.
  5. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I like the piece, but don’t know where to go from where I am. Mouth? Hair? The attitude I need to have is that I can’t ruin it; there is always more fabric. Possibility for abandonment.
  6. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.

Ready for Quilting

  1. New:* Wonky 9 Patch: needs quilting and binding. I am still thinking about quilting this myself and I am thinking about it more and more. I am wondering how far apart I can quilt it so that it has some drape. (Not on original list)
  2. Infinity blocks: blocks sewn together into a quilt top, borders on. Back and binding made; at the quilter.
  3. Spiderweb: Top is together, binding is made. This is at the quilter.
  4. New:* FOTY 2012: top, finished. Back and binding are complete; at the quilter.
  5. New:*Star Sampler: Top finished, back and binding finished; at the quilter. (not on original list)
  6. New:*Fresh Fruit: Top finished, back and binding finished; at the quilter. (not on original list)
  7. Flower Sugar Hexagons / Attack of the Hexies – Top finished 1/12/2014: I finished the top, back and the binding on January 12. It is ready to be taken to the quilter.

In the Finishing Process

None in January.

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on a project that is “In Process.”

Hunting and Gathering

  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I will use a grey for the  background, because if I use more of the cut fabric patches, the pattern will be lost. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Super Secret Project #3: working on color choices.

Abandoned

Nothing so far for 2014

Last update for the 26 Projects List. Read it. There’s some interesting stuff there.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made progress. I plan to stop this post when I have no more projects from the original list to write about. I wonder when that will be?

*New – Project started after I started working on the 26 Projects list

 

26 Projects List – December Update

I told you that I was thinking about changing the name of this post in the new year.  I think it is a valuable post for me to write, so I have decided that I will continue, but will just change it somewhat. I will freshen it up a bit to reflect the progress I have made on the old projects and change the focus to WIPs rather than UFOs.

12 quilts finished in 2013 is something of which to be proud, thanks to the 26 Projects post.

Again I need to keep in mind that I need to focus my efforts on not filling up the list with UFOs again. I don’t mind having a few projects going at once, but I continue to feel that I don’t want stalled projects hanging around for years. I really don’t. That is the key: I have to work on the projects. If I work on projects in which I am interested, I don’t think I will let them languish for years.

Finished 2013 Projects:

  1. Corner Store: Finished on 1/1/2013 YAY!
  2. The Garden. Finished on 1/5/2013 YAY!
  3. Stepping Stones: Finished on 2/14/2013 YAY!
  4. Fabric of the Year 2011: Finished on 2/27/2013 YAY
  5. Calm: Finished on 3/14/2013 YAY!
  6. A-B-C Challenge: Finished on 3/31/2013 YAY!
  7. Super Secret Project #1: Finished on June 13, 2013
  8. Super Secret Project #2: Finished on June 23, 2013
  9. Sparkle Pink: Finished on August 20, 2013
  10. Swoon: Finished on August 27, 2013
  11. Original Bullseye: Finished on October 20, 2013
  12. T-Shirt quilt: Finished

Other non-quilt Projects finished

Still WIPs

WIPs Collage Jan 2014
WIPs Collage Jan 2014
  1. Aqua-Red SamplerFrances and I are stalled. She has a lot going on, but I hope we will get back to it. I am thinking about the next tutorial regardless.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, every once in a while I think about using some of the squares as leaders and enders.
  4. See: needs satin stitching. Small, also a possibility for finishing before the end of the year, though with all the cutting I have done recently, perhaps not so much.
  5. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I like the piece, but don’t know where to go from where I am. Mouth? Hair? The attitude I need to have is that I can’t ruin it; there is always more fabric. Possibility for abandonment.
  6. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.
  7. Flower Sugar Hexagon: This piece is up on the design wall and I have sewed a few more hexagons together, but haven’t made significant progress despite looking at it all the time. I am beginning to think I should have added fabrics from different lines to this piece.

Ready for Quilting

Again, I don’t have anything ready to take to my quilter. The machine being in the shop has put a cramp in my style this month. Sigh.

  1. New:* Wonky 9 Patch: needs quilting and binding. I am still thinking about quilting this myself and I am thinking about it more and more. I am wondering how far apart I can quilt it so that it has some drape. (Not on original list)
  2. Infinity blocks: blocks sewn together into a quilt top, borders on. Back and binding made; at the quilter.
  3. Spiderweb: Top is together, binding is made. This is at the quilter.
  4. New:* FOTY 2012: top, finished. Back and binding are complete; at the quilter.
  5. New:*Star Sampler: Top finished, back and binding finished; at the quilter. (not on original list)
  6. New:*Fresh Fruit: Top finished, back and binding finished; at the quilter. (not on original list)

Please note that even if you combine the two lists above, I do not have 26 projects on this list anymore. This is true even though I keep starting new projects. I am thrilled that I have made progress!!!

In the Finishing Process

  • Original Bullseye: Sleeve made. still working on the hand sewing. I have been embellishing Christmas stockings instead of sewing on the sleeve.

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on something In Process.

Hunting and Gathering

  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. Need to find a background, because if we use the cut fabrics, the pattern will be lost. The pieces are too oddly shaped to lose the pattern in a mass of scraps.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Super Secret Project #3: working on color choices.

Abandoned

Nothing so far for 2013

Last update for the 26 Projects List. Read it. There’s some interesting stuff there.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made progress. I plan to stop this post when I have no more projects from the original list to write about. I wonder when that will be?

*New – Project started after I started working on the 26 Projects list

26 Projects List – November 2013 Update

I am just squeaking this update in under the wire. I almost forgot to post an update this month. Perhaps remembering is a sign I am getting back on track?

I am thinking about changing the name of this post in the new year. Freshen it up a bit to reflect the progress I have made on the old projects. We’ll see how things shake out. 12 quilts finished is nothing to sneeze at, but I am hoping to finish at least one more project this year.

Again I need to keep in mind that I need to be thinking about whether or not to focus my efforts on not filling up the list again. I don’t mind having a few projects going at once, but I continue to feel that I don’t want stalled projects hanging around for years. I really don’t. That is the key: I have to work on them. If I work on projects in which I am interested, I don’t think I will let them languish for years.

Finished 2013 Projects:

  1. Corner Store: Finished on 1/1/2013 YAY!
  2. The Garden. Finished on 1/5/2013 YAY!
  3. Stepping Stones: Finished on 2/14/2013 YAY!
  4. Fabric of the Year 2011: Finished on 2/27/2013 YAY
  5. Calm: Finished on 3/14/2013 YAY!
  6. A-B-C Challenge: Finished on 3/31/2013 YAY!
  7. Super Secret Project #1: Finished on June 13, 2013
  8. Super Secret Project #2: Finished on June 23, 2013
  9. Sparkle Pink: Finished on August 20, 2013
  10. Swoon: Finished on August 27, 2013
  11. Original Bullseye: Finished on October 20, 2013
  12. T-Shirt quilt: Finished

Other non-quilt Projects finished

Still WIPs

  1. Aqua-Red SamplerFrances and I are stalled. She has a lot going on, but I hope we will get back to it. I should be able to do the next tutorial regardless.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, every once in a while I think about using some of the squares as leaders and enders.
  4. See: needs satin stitching. Small, also a possibility for finishing before the end of the year, though with all the cutting I have done recently, perhaps not so much.
  5. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I like the piece, but don’t know where to go from where I am. Mouth? Hair? The attitude I need to have is that I can’t ruin it; there is always more fabric. Possibility for abandonment.
  6. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.
  7. Flower Sugar Hexagon: This piece is up on the design wall and I have sewed a few more hexagons together, but haven’t made significant progress despite looking at it all the time. I am beginning to think I should have added fabrics from different lines to this piece.

Ready for Quilting

Again, I don’t have anything ready to take to my quilter. The machine being in the shop has put a cramp in my style this month. Sigh.

  1. New:* Wonky 9 Patch: needs quilting and binding. I am still thinking about quilting this myself and I am thinking about it more and more. I am wondering how far apart I can quilt it so that it has some drape. (Not on original list)
  2. Infinity blocks: blocks sewn together into a quilt top, borders on. Back and binding made; at the quilter.
  3. Spiderweb: Top is together, binding is made. This is at the quilter.
  4. New:* FOTY 2012: top, finished. Back and binding are complete; at the quilter.
  5. New:*Star Sampler: Top finished, back and binding finished; at the quilter. (not on original list)
  6. New:*Fresh Fruit: Top finished, back and binding finished; at the quilter. (not on original list)

Please note that even if you combine the two lists above, I do not have 26 projects on this list even though I keep starting new things. I am so thrilled I have made progress!!!

In the Finishing Process

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on something In Process.

Hunting and Gathering

      • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
      • Windmill quilt: Still hunting and gathering. Need to find a background, because if we use the cut fabrics, the pattern will be lost. The pieces are too oddly shaped to lose the pattern in a mass of scraps.
      • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
      • Super Secret Project #3: working on color choices.

Abandoned

Nothing so far for 2013

Last update for the 26 Projects List. Read it. There’s some interesting stuff there.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made progress. I plan to stop this post when I have no more projects from the original list to write about. I wonder when that will be?

*New – Project started after I started working on the 26 Projects list

26 Projects – October Update

I still have 7 projects on my WIPs list, but only 3 (4?) of them are really old. Two projects, from the “In the Quilting” stage, are ready for binding. I am still kind of in awe at how much progress I have made since I counted up my UFOs for the first time and decided to do something about it. It was 2 years ago that I started. All of the really old UFOs are mostly taken care of.

Again I need to keep in mind that I need to be thinking about whether or not to focus my efforts on not filling up the list again. I don’t mind having a few projects going at once, but I continue to feel that I don’t want stalled projects hanging around for years. I really don’t. That is the key: I have to work on them.

The machine is still in the shop, so I haven’t been doing a lot of sewing, even with the loaner (finally gave up). I pulled out the Jem and have done a bit of sewing. I have been doing a lot of cutting – still for Scrapitude, but also for one of the Super Secret Projects and a little for the Russian Rubix. Cutting so much means new projects. 😉

Finished 2013 Projects:

  1. Corner Store: Finished on 1/1/2013 YAY!
  2. The Garden. Finished on 1/5/2013 YAY!
  3. Stepping Stones: Finished on 2/14/2013 YAY!
  4. Fabric of the Year 2011: Finished on 2/27/2013 YAY
  5. Calm: Finished on 3/14/2013 YAY!
  6. A-B-C Challenge: Finished on 3/31/2013 YAY!
  7. Super Secret Project #1: Finished on June 13, 2013
  8. Super Secret Project #2: Finished on June 23, 2013
  9. Sparkle Pink: Finished on August 20, 2013
  10. Swoon: Finished on August 27, 2013
  11. Original Bullseye: Finished on October 20, 2013

Other non-quilt Projects finished

  • 5 donation Pillowcases
  • 2 fabric handbags/project bags
  • 6 cat beds
  • 12 napkins
  • Petrillo Bag*: Finished on May 5, 2013 YAY!

Still WIPs

  1. Aqua-Red SamplerFrances and I are stalled. She has a lot going on, but I hope we will get back to it. I should be able to do the next tutorial regardless.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, every once in a while I think about using some of the squares as leaders and enders.
  4. See: needs satin stitching. Small, also a possibility for finishing before the end of the year, though with all the cutting I have done recently, perhaps not so much.
  5. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I like the piece, but don’t know where to go from where I am. Mouth? Hair? The attitude I need to have is that I can’t ruin it; there is always more fabric. Possibility for abandonment.
  6. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.
  7. Flower Sugar Hexagon: This piece is up on the design wall and I have sewed a few more hexagons together, but haven’t made significant progress despite looking at it all the time.

Ready for Quilting

Again, I don’t have anything ready to take to my quilter. The machine being in the shop has put a cramp in my style this month. Sigh.

  1. New:* Wonky 9 Patch: needs quilting and binding. I am still thinking about quilting this myself and I am thinking about it more and more. I am wondering how far apart I can quilt it so that it has some drape. Not on original list
  2. Infinity blocks: blocks sewn together into a quilt top, borders on. Back and binding made; at the quilter.
  3. Spiderweb: Top is together, binding is made. This is at the quilter.
  4. New:* FOTY 2012: top, finished. Back and binding are complete; at the quilter.
  5. New:*Star Sampler: Top finished, back and binding finished; at the quilter. (not on original list)
  6. New:*Fresh Fruit: Top finished, back and binding finished; at the quilter.(not on original list)

Please note that even if you combine the two lists above, I do not have 26 projects on this list even though I keep starting new things. I am so thrilled I have made progress!!!

In the Finishing Process

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on something In Process.

Hunting and Gathering

      • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
      • Windmill quilt: Still hunting and gathering. Need to find a background, because if we use the cut fabrics, the pattern will be lost. The pieces are too oddly shaped to lose the pattern in a mass of scraps.
      • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
      • Super Secret Project #3: working on color choices.

Abandoned

Nothing so far for 2013

Last update for the 26 Projects List. Read it. There’s some interesting stuff there.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made progress. I plan to stop this post when I have no more projects from the original list to write about. I wonder when that will be?

*New – Project started after I started working on the 26 Projects list

26 Projects – September 2013 Update

I just noticed that I have only 7 projects on my WIPs list. I have really made progress, which is a good reminder that I need to focus my efforts on not filling up the list again. I don’t mind having a couple of projects going at once, but I don’t want projects that are stalled hanging around for years. I really don’t.

I talked this week about all the cutting that I did. All true. I don’t know why I cut for the Scrapitude mystery quilt, but I did. I didn’t cut all the pieces for each project, but I cut bunches of pieces for a variety of projects.

I made good progress on the cutting for the Russian Rubix and started talking about Easy Street.

Finished 2013 Projects:

  1. Corner Store: Finished on 1/1/2013 YAY!
  2. The Garden. Finished on 1/5/2013 YAY!
  3. Stepping Stones: Finished on 2/14/2013 YAY!
  4. Fabric of the Year 2011: Finished on 2/27/2013 YAY
  5. Calm: Finished on 3/14/2013 YAY!
  6. A-B-C Challenge: Finished on 3/31/2013 YAY!
  7. Petrillo Bag*: Finished on May 5, 2013 YAY!
  8. Super Secret Project #1: Finished on June 13, 2013
  9. Super Secret Project #2: Finished on June 23, 2013
  10. Sparkle Pink: Finished on August 20, 2013
  11. Swoon: Finished on August 27, 2013

Other non-quilt Projects finished

  • 5 donation Pillowcases
  • 2 fabric handbags/project bags
  • 6 cat beds
  • 12 napkins

Still WIPs

  1. Aqua-Red SamplerFrances  is working diligently, though I know she feels frustrated with the foundation pieced block. I think part of that is because she is left handed and I am right handed. I finished the foundation piecing tutorial, along with my block for this part of the class. I am not giving up on her. I hope she comes back.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though I did think about working on it. I hope that counts for something. I really do need to get back to the quilting. I am still a little mad at myself for making such good progress and then getting sidetracked. I thought quilting the Whole Cloth quilt would get me back in the swing of quilting, but apparently not.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. Mrs. K. gave me more PP fabric and I won some from a giveaway. I still think it is a sign that I need to work on this. Leaders and enders.
  4. See: needs satin stitching. Small, also a possibility for finishing. I really have the feeling I came so close to working on this project this month.
  5. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I like the piece, but don’t know where to go from where I am. Mouth? Hair? The attitude I need to have is that I can’t ruin it; there is always more fabric.
  6. Under the Sea: class project; like the design, but not the colors much.
  7. Flower Sugar Hexagon: I have sewed enough of the hexagons together over the weekend to make the piece a normal shape. It is about half the size I want it to be, so I will work on sewing together the other half. I might start a new chunk and then sew that new chunk to the old chunk once I am done. It might be easier than sewing one or two hexagons together. We will see. I may make it a few rows longer, too.

Ready for Quilting

I took 5 quilts to the quilter last week: Infinity Blocks, which I had thought I would quilt myself, Fresh Fruit, FOTY 2013, Star Sampler, which nothing could induce me to quilt myself, and the Young Man’s t-shirt quilt. PROGRESS!

  1. Original Bullseye: At the quilter
  2. New:* Wonky 9 Patch: needs basting, quilting and binding. Not on original list
  3. Infinity blocks: blocks sewn together into a quilt top, borders on. Back and binding made; at the quilter.
  4. Spiderweb: Top is together, binding is made. This is at the quilter.
  5. New:* FOTY 2012: top, finished. Back and binding are complete; at the quilter.
  6. New:*Star Sampler: Top finished, back and binding finished; at the quilter. (not on original list)
  7. New:*Fresh Fruit: Top finished, back and binding finished; at the quilter.(not on original list)
  8. Young Man’s t-shirt quilt: Top, back and binding are all ready; at the quilter.

Please note that even if you combine the two lists above, I do not have 26 projects on this list anymore. I have made progress!!!

In the Finishing Process

  1. It doesn’t really count as finished, though I am putting a sleeve on the Swoon.

Abandoned

Nothing so far for 2013

Hunting and Gathering

  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. Need to find a background, because if we use the cut fabrics, the pattern will be lost. The pieces are too oddly shaped to lose the pattern in a mass of scraps.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Super Secret Project #3: working on color choices.

Last update for the 26 Projects List. Read it. There’s some interesting stuff there.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made progress. I plan to stop this post when I have no more projects from the original list to write about. I wonder when that will be?

*New – Project started after I started working on the 26 Projects list

August 26 Projects List

I just noticed that I have only 8 projects on my WIPs list. EIGHT!!! I have really made progress.

Finished 2013 Projects:

  1. Corner Store: Finished on 1/1/2013 YAY!
  2. The Garden. Finished on 1/5/2013 YAY!
  3. Stepping Stones: Finished on 2/14/2013 YAY!
  4. Fabric of the Year 2011: Finished on 2/27/2013 YAY
  5. Calm: Finished on 3/14/2013 YAY!
  6. A-B-C Challenge: Finished on 3/31/2013 YAY!
  7. Petrillo Bag*: Finished on May 5, 2013 YAY!
  8. Super Secret Project #1: Finished on June 13, 2013
  9. Super Secret Project #2: Finished on June 23, 2013

Other non-quilt Projects finished

  • 5 donation Pillowcases
  • 2 fabric handbags/project bags
  • 6 cat beds

Still WIPs

  1. Aqua-Red SamplerFrances  is working diligently, though I know she feels frustrated with the foundation pieced block. I think part of that is because she is left handed and I am right handed. I finished the foundation piecing tutorial, along with my block for this part of the class. I am not giving up on her.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though I did think about working on it. I hope that counts for something. I really do need to get back to the quilting. I am still a little mad at myself for making such good progress and then getting sidetracked. I thought quilting the Whole Cloth quilt would get me back in the swing of quilting, but apparently not.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. Mrs. K. gave me more PP fabric and I won some from a giveaway. I still think it is a sign that I need to work on this. Leaders and enders.
  4. See: needs satin stitching. Small, also a possibility for finishing. I really have the feeling I came so close to working on this project this month.
  5. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I like the piece, but don’t know where to go from where I am. Mouth? Hair? The attitude I need to have is that I can’t ruin it; there is always more fabric.
  6. Under the Sea: class project; like the design, but not the colors much.
  7. Flower Sugar Hexagon: I thought about sewing more hexagons together. Although not difficult, sewing Y seams is a bit of a chore, so I get tired of doing it after awhile. I could, perhaps, use leaders and enders to get this piece moving?

Ready for Quilting

  1. Original Bullseye: At the quilter
  2. New:* Wonky 9 Patch: needs basting, quilting and binding. Not on original list
  3. Infinity blocks: blocks sewn together into a quilt top, borders on. Back and binding made; ready to be quilted.
  4. Spiderweb: Top is together, binding is made. This is at the quilter.
  5. New:* FOTY 2012: top, finished, though I can’t decide if I need a quilting border. Back and binding are complete; I am waiting to take it to the quilter.
  6. New:*Star Sampler: Top finished, back and binding finished. Ready to go to the quilter (not on original list)
  7. New:*Fresh Fruit: Top finished, back and binding finished. Ready to go to the quilter (not on original list)
  8. Young Man’s t-shirt quilt: Top, back and binding are all ready to go to the quilter.

Please note that even if you combine the two lists above, I do not have 26 projects on this list anymore. I have made progress!!!

In the Finishing Process

  1. New:* Sparkle Pink – quilted, working on binding it.  (not on original list)
  2. New:* Swoon – Quilted; ready for binding.

Abandoned

Nothing so far for 2013

Hunting and Gathering

  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.

Last update for the 26 Projects List. Read it. There’s some interesting stuff there.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made progress. I plan to stop this post when I have no more projects from the original list to write about. I wonder when that will be?

*New – Project started after I started working on the 26 Projects list