26 Projects – December 2016 Edition

I have been sewing fairly steadily for the past month or so. I am making progress, but don’t have any finishes – or any large finishes – to speak of. Somehow I feel like I am in a morass of projects and not able to move forward. It is as though I am sewing in place.

Finished 2016 Quilt Projects

Finished 2016 non-Quilt Projects

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.

  • Carpenter’s Wheel blocks – I still need to make a few blocks, though I did see a layout similar to the one I mentioned I liked in the new book I got from Sandy K from the BAMQG Winter Extravaganza Palooza Swap. The layout has the blocks laid out in a circle.
  • English Paper Piecing Project– half hexies – I am still making stars. I cut a big stack of fabrics for more stars over Thanksgiving.
  • Lobster – have more stitching to do and then I need to quilt it.
  • Octagon 9 Patch: ready to put together. Not sure what I am waiting for. Another leaders/enders project or do I want to lay out the blocks more carefully?
  • Peacock Quilton the design wall and sewing the top together is in process.
  • Pies and Points from Victoria Findlay Wolfe class. No further progress. I did find more of the background fabric when I went to Portland, so I can make a larger piece.
  • Stepping Stones #2 – I am in the process of making the border blocks after I designed them to be a little different from the first Stepping Stones quilt.
  • Under the Sea: class project; like the design and am happier with the colors. I bought a few spools of Aurifil 12wt and have been embroidering motifs with it and Perl Cotton. It might become a lush pillow for someone.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

    1. Aqua-Red Sampler – I made progress on the partial seaming tutorial and need to sit down to finish it.
    2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, it is in a prominent location so I have easy access. I am taking a machine quilting workshop soon (shock, horror, I know) and the focus is on background motifs. Just what I need!
    3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this project either, but I do think about it.
    4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
    5. Serendipity Lady Quilt: no progress, though I have been thinking about her.

Ready for Quilting

  • Thanksgiving tablemat

In Quilting Process

  • Theoretically, the Tarts Come to Tea is in the quilting process.

Binding

None

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5 inch x 4.5 inch blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2? squares
  • Pink Gradation Quilt: cutting 2.5 inch x 4.5 inch pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. I bought a new template, so I should be able to get going again

Other

What’s on your list?

The Peacock – a Bit of Progress

Peacock - early December 2016
Peacock – early December 2016

Push has really come to shove on this project. I have to decide how to arrange the solids in the upper right hand corner. I have some strips cut and some ideas percolating, but this is where my design and construction style can run into problems.

I think the blues I have on the right will have to move up and I will have to use one that is darker to blend the dark-medium green more to the blues higher up.

There is a very strong diagonal line made from the greens on the middle right. I may need to figure out a way to smudge it as it is quite prominent.

As you can see, on the left, I also made the dark small hexies. They are not placed in their final location, but they will be towards the bottom left when all is said and done. As I have said 500 times, I need a larger design wall. Although, I fear if I have a larger design wall, my quilts will become larger.

Design Wall Monday

Design Wall Week of November 21, 2016
Design Wall Week of November 21, 2016

I don’t regularly post my design wall, though I do occasionally. The last time was in July. I am posting it this week, because I was enamoured with the look of my design wall last week.

As I said, I pressed and cut up many pieces of fabric over the weekend. Partway through my flurry of cutting, I looked up at the design wall to place another FOTY square and saw very little space left. As you can see above, the 4″ FOTY squares have almost taken over the space.

Design Wall Week of November 21, 2016
Design Wall Week of November 21, 2016

This time I don’t have very may different projects on the way. Part of that is because the Lobster fell off. Part of that is that The Peacock is taking up almost all of the other design wall.

  • 1,3 – FOTY squares
  • 2 – Stepping Stones
  • 4 – Bonnie Hunter Essential Triangle Tool
  • 5 – City Sampler blocks

There is actually a lot happening in my workroom, but it all seems to be in process with nothing every getting finished. Soon, I hope.

 

I am linking up with the Patchwork Times.

26 Projects – November 2016 edition

The last time I reviewed my list was in July. I have made some progress, but not a lot. August was pretty much a desert for getting projects done and I was gone in September so no sewing then either. I was ready to rock in October and am making some progress.

Finished 2016 Quilt Projects

Finished 2016 non-Quilt Projects

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.

  • Carpenter’s Wheel blocks – I finished #9 and #10. I thought this finish concluded the blocks. However, after I laid them out, I realized that I didn’t have enough to do what I wanted. I need to make a few more. Perhaps as leaders and enders?
  • English Paper Piecing Project– half hexies – I added three more stars to the large piece over the weekend. I also measure the piece and figure out how much more I have to stitch to get it to a good size.
  • Lobster – have more stitching to do and then I need to quilt it.
  • Octagon 9 Patch: ready to put together. Not sure what I am waiting for. Another leaders/enders project or do I want to lay out the blocks more carefully?
  • Peacock Quilton the design wall and sewing the top together is in process.
  • Pies and Points from Victoria Findlay Wolfe class. No further progress. I did find more of the background fabric when I went to Portland, so I can make a larger piece.
  • Stepping Stones #2 – I am in the process of making the border blocks after I designed them to be a little different from the first Stepping Stones quilt.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

  1. Aqua-Red Sampler – I made progress on the partial seaming tutorial and need to sit down to finish it.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, it is in a prominent location so I have easy access. I am taking a machine quilting workshop soon (shock, horror, I know) and the focus is on background motifs. Just what I need!
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this project either, but I do think about it.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
  5. Under the Sea: class project; like the design and am happier with the colors. I bought a few spools of Aurifil 12wt and have been embroidering with it and the Perl Cotton on it. It might become a lush pillow for someone.
  6. Serendipity Lady Quilt

Ready for Quilting

  • Thanksgiving tablemat

In Quilting Process

  • Theoretically, the Tarts Come to Tea is in the quilting process. I am taking a class next weekend that may give me some ideas and perhaps get me back on track with it.

Binding

None

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5″x 4.5″ blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2″ squares
  • Pink Gradation Quilt: cutting 2.5″x 4.5″ pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. I bought a new template, so I should be able to get going again

Other

What’s on your list?

Design Wall Monday – mid-July

It has been almost a month since I did a Design Wall post. The wall seems like a storage facility for pieces and parts lately. I am putting patches, bits of fabric, parts of blocks and hunting / gathering pieces up to get them out of the way more than work on them. Space feels at a premium in my workroom right at the moment.

Design Wall mid-July
Design Wall mid-July
  1. Flying Geese. I am making some sets of them again. I don’t think I need anymore for the design I am contemplating, but I have a stack of squares already cut and so I might as well make them.

2. I am still collecting red donation blocks. The two set apart are the latest.

3. FOTY 2016 latest squares. You can see some of the Food Quilt #3 fabrics showing up.

4. Donation squares. I seem to have mislaid the box, so I have been putting them on the design wall until it turns up, which it will undoubtedly do. This is always why there are no new donation blocks. No fabric = no blocks.

5. Partial seam block for my Aqua-Red Sampler. Tutorial coming soon.

6. Turquoise donation block. I am thinking of making a bunch of these next for another donation top.

7. Stepping Stones block. This is my sample. Yesterday I made some progress in my head about making the parts for the rest of the blocks I intend to make.

8. Lobster Placemat. I still need to do some stitching.

9. Pieces and parts for a Stepping Stones block.

10. Start of another donation block. I really need to find that bin!

11. Four patch for a blue donation block.

What’s on your design wall?

 

 

I am linking up with Judy Laquidara at the Patchwork Times.

July 2016 26 Projects List

I haven’t reviewed this list since April! I suppose I have too much other content to report on.

Finished 2016 Quilt Projects

Finished 2016 non-Quilt Projects

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

  1. Aqua-Red Sampler – I made progress on the partial seaming tutorial and need to sit down to finish it.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, it is in a prominent location so I have easy access. I was thinking about how this was veering in the direction of being one of my ‘masterpieces,’ but now that it has languished for so long it just looks old and dated. :(
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this project either, but I do think about it.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
  5. Under the Sea: class project; like the design, but not the colors. Still a possibility for abandonment. Just can’t seem to pull the trigger.
  6. Serendipity Lady Quilt

Ready for Quilting
Wow! Everything on this list is new, as in it was never on the original 26 Projects list.

  • 2 Thanksgiving tablerunners
  • Thanksgiving tablemat

In Quilting Process

Binding

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5?x 4.5? blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2? squares
  • Pink Gradation Quilt: cutting 2.5?x 4.5? pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. The problem is that I mislaid the rotary template. Sigh. I may be able to cut the greys on a Sizzix.

Other

 

 

What’s on your list?

Finished: Food Quilt #3 Top & Back

There was a Sew-in this past weekend (4th of July in the US) and I spent most of the time working on the finishing aspects of the Food Quilt #3. I finished the binding on Saturday and the back on Sunday. Even though I have other projects on which to work, this felt like a coup.

Food Quilt #3: Finished top
Food Quilt #3: Finished top

The piece is about 101″x 86″. Yes, it is huge, which means that I don’t have a full picture of the top or back. The YM was gone, it was cold outside and I don’t have a room large enough to lay out the back or top. The above photo is part of the top with a bit of the back peeking through.

Food Quilt #3: Finished back
Food Quilt #3: Finished back

Of course the back is larger. Again, I have shown you only part of it due to the size.

I am pleased that this is done and will see about getting this and FOTY 2015 to the quilter soon.

Food Quilt #3: Making Progress

Food Quilt #3: Center
Food Quilt #3: Center

I made a little progress on Food Quilt #3 over last weekend. The center is now done. My next step is to put a thin (not sure how thin) black border around the center and then attach the piano key border to the black border. I have to decide if I want to use a solid back or a white on black. If I use the latter, I want it to have a subtle white design on it.

You may have also noticed that I have broken the bounds of the design wall and the quilt is laying on the floor. Crazy, I know!

Design Wall Monday

I don’t do this type of post every week, but felt like giving you an update this week. I also wonder if you haven’t seen this same Stepping Stones strewn design wall a million times before. I think the last update was in October.

Design Wall 6/13/2016
Design Wall 6/13/2016
  1. Flying Geese: I haven’t made anymore or received any in awhile. I still have my design and lots of squares cut, so I need to get back to this.

2. Donation blocks. I am saving the red blocks to make a quilt top. I think I have enough, but I haven’t counted. You can see the stash at the bottom of my design wall under #3. I might also be saving the blue blocks to do the same. We’ll see.

3. Newest FOTY 2016 squares.

4. Stepping Stones blocks. I am stuck with these on the wall, because I have half a block done. I need more HSTs to finish it. I don’t want to put them away until I get around to it in case I forget what needs to be done. I also found a stash of Turquoise/Red Stepping Stones blocks, so I might have enough to make something.

5. Blue donation block in progress. I usually put the pieces and parts of blocks in progress near where I can reach them as I use them for leaders and enders.

6. My box of donation 2.5″ patches waiting to become blocks.

 

I am linking up with Judy Laquidara at the Patchwork Times

May 2016: 26 Projects List

In my last post on this topic, I was feeling as though I was on the verge of finishing several projects. I have two large quilt projects well in hand, but nothing else, really. I guess that means I am still on the verge or was mistaken or could have been experiencing a bout of wishful thinking.

Finished 2016 Quilt Projects

Cityscape/Red & Black Improv Quilt – I still have to put the sleeve on, but the binding is on, so it is ready to go.

Flower Sugar donation quilt (I feel odd putting this finish here as there is so much I didn’t do on this piece – still there isn’t anywhere else to put it)

Finished 2016 non-Quilt Projects

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch.

  • Carpenter’s Wheel blocks – I finished all of them and am working on the layout.
  • English Paper Piecing Project– half hexies – I finished adding another big section. I am excited about the La Passcaglia EPP project, so I may finish this up as….something and then move on. We’ll see. I had thought about this as my NSGW project and I may need to see that through.
  • Food Quilt #3 – food patches are cut. I went to start sewing and realized I didn’t have the center squares cut, so I have started to cut those. I haven’t made much progress, though I have purchased a few and may get busy as this would be a good quilt on which to make progress during the sewing of the FOTY 2015 patches.
  • Lobster – have more stitching to do and then I need to quilt it.
  • Horizon Midi Bag – have to finish top stitching
  • Octagon 9 Patch: ready to put together. Not sure what I am waiting for
  • Peacock Quilt – all of the large blocks are finished and I am working on the smaller blocks!
  • Pies and Points from Victoria Findlay Wolfe class. No further piecing progress, but I did buy more background fabric.
  • Stepping Stones #2 – I worked on this for awhile. I used the project as leaders and enders while I was sewing FOTY 2015. I need to measure the blocks I have and figure out where to go from here.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO, to me, is a WIP. The list is a lot shorter and the projects are newer, for the most part.

  1. Aqua-Red Sampler – I still have to work on the partial seaming tutorial.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, it is in a prominent location so I have easy access. I was thinking about how this was veering in the direction of being one of my ‘masterpieces,’ but now that it has languished for so long it just looks old and dated. :(
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this project either, but I do think about it.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
  5. Under the Sea: class project; like the design, but not the colors. Still a possibility for abandonment. Just can’t seem to pull the trigger.
  6. City Sampler/ Tale of Two Cities blocks. No progress despite the small group at BAMQG.
  7. Serendipity Lady Quilt

Ready for Quilting
Wow! Everything on this list is new, as in it was never on the original 26 Projects list.

  • 2 Thanksgiving tablerunners

In Quilting Process

Nothing being quilted.

Binding

  • Flowerburst

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5″x 4.5″ blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2″ squares
  • Food Quilt #3: cutting blue fabrics
  • Pink Gradation Quilt: cutting 2.5″x 4.5″ pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space in my schedule.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. The problem is that I mislaid the rotary template. Sigh. I may be able to cut the background greys on a Sizzix.

What’s on your list?

April 2016: 26 Projects

In my last post on this topic, I felt like all of my sewing work was heavy and unmovable. Fortunately, that feeling has passed. I have made some progress. I am also still thinking about working slower.

Finished 2016 Quilt Projects

Flower Sugar donation quilt (I feel odd putting this finish here as there is so much I didn’t do on this piece – still there isn’t anywhere else to put it)

Finished 2016 non-Quilt Projects

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch.

  • Carpenter’s Wheel blocks – I finished #9 and #10. This concludes the blocks and I will start laying them out soon.
  • English Paper Piecing Project– half hexies – I am adding another big section, but I have done half and stopped. Slowly but surely wins the race
  • Food Quilt #3 – food patches are cut. I went to start sewing and realized I didn’t have the center squares cut, so I have started to cut those. I am going for darker blues. Not navy, but not turquoise either. Somewhere in between since I want the quilt to feel boyish.
  • Lobster – have more stitching to do and then I need to quilt it.
  • Octagon 9 Patch: ready to put together. Not sure what I am waiting for
  • Peacock Quilt – made a lot of progress sewing pieces and parts
  • Pies and Points from Victoria Findlay Wolfe class. No further progress yet
  • Stepping Stones #2 – I haven’t worked on this in awhile, but I still have one block on the wall for inspiration. I actually thought about working on it as leaders and enders, but defaulted to donation squares. No progress.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

  1. Aqua-Red Sampler – I still have to work on the partial seaming tutorial.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, it is in a prominent location so I have easy access. I was thinking about how this was veering in the direction of being one of my ‘masterpieces,’ but now that it has languished for so long it just looks old and dated. :(
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this project either, but I do think about it.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
  5. Under the Sea: class project; like the design, but not the colors. Still a possibility for abandonment. Just can’t seem to pull the trigger.
  6. City Sampler/ Tale of Two Cities blocks
  7. Serendipity Lady Quilt

Ready for Quilting
Wow! Everything on this list is new, as in it was never on the original 26 Projects list.

  • 2 Thanksgiving tablerunners

In Quilting Process

  • Flowerburst – the quilter
  • Red & Black Improv quilt – at the quilter

Binding

  • I made the binding for one Thanksgiving tablerunner, so I am ready to handstitch it.

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5?x 4.5? blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2? squares
  • Food Quilt #3: cutting blue fabrics
  • Pink Gradation Quilt: cutting 2.5?x 4.5? pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space in my schedule.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. The problem is that I mislaid the rotary template. Sigh. I may be able to cut the greys on a Sizzix.

What’s on your list?

March 2016: 26 Projects

March?? March already? What happened to January and February? The last time I posted on this topic was back in December and that was a great post, because I had accomplished so much. So far this year, there is a lot of hunting and gathering going on, but not many completions. It is all about process, though, right?

Finished 2016 Quilt Projects

none so far

Finished 2016 non-Quilt Projects

In Process
The  ‘In Process’ is used to denote projects on which I am actively (or pretending) working. A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP.

  • Carpenter’s Wheel blocks – I finished #8 and started to sew #9
  • English Paper Piecing Project– half hexies – slowly but surely wins the race
  • Food Quilt #3 – pieces are cut. I need to start sewing
  • Lobster – have more stitching to do and then I need to quilt it.
  • Octagon 9 Patch: ready to put together. Not sure what I am waiting for
  • Peacock Quilt – need to sew pieces and parts
  • Pies and Points from Victoria Findlay Wolfe class.
  • Stepping Stones #2 – I haven’t worked on this, but I still have one block on the wall for inspiration. I could work on it at any time.

Still WIPs
I still have WIPs. Who doesn’t, after all? The list is a lot shorter and the projects are newer, for the most part.

  1. Aqua-Red Sampler – I still have to work on the partial seaming tutorial.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, it is in a prominent location so I have easy access. I was thinking about how this was veering in the direction of being one of my ‘masterpieces,’ but now that it has languished for so long it just looks old and dated. :(
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this project either, but I do think about it.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have been feeling like I need to finish this piece as it should be a good reminder to keep in my office.
  5. Under the Sea: class project; like the design, but not the colors. Still a possibility for abandonment. Just can’t seem to pull the trigger.
  6. City Sampler/ Tale of Two Cities blocks
  7. Serendipity Lady Quilt

Ready for Quilting
Wow! Everything on this list is new, as in it was never on the original 26 Projects list.

  1. 2 Thanksgiving tablerunners
  2. Flowerburst

In Quilting Process

  • Christmas Tablerunner – nearly done

Binding

  • I have to make the binding for one Thanksgiving tablerunner and then bind it.

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5″x 4.5″ blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2″ squares
  • Food Quilt #3: cutting food prints
  • Pink Gradation Quilt: cutting 2.5″x 4.5″ pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space in my schedule.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. The problem is that I mislaid the rotary template. Sigh. I may be able to cut the greys on a Sizzix.

What’s on your list?

December 2015: 26 Projects

I am reeling that it is December already. Sheesh!

Finished 2015 Quilt Projects

Finished 2015 non-Quilt Projects

Still WIPs
I still have WIPs. Who doesn’t, after all, but the list is getting a lot smaller.

  1. Aqua-Red SamplerFrances and I finished the Basket block and you can make one as well by looking at the tutorial series. Now I am tasked with doing a tutorial on partial seaming.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, it is in a prominent location so I have easy access. I was thinking about how this was veering in the direction of being one of my ‘masterpieces,’ but now that it has languished for so long it just looks old and dated. 🙁
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this project either, but I do think about it.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have been feeling like I need to finish this piece as it should be a good reminder to keep in my office.
  5. Under the Sea: class project; like the design, but not the colors. Still a possibility for abandonment. Just can’t seem to pull the trigger.
  6. City Sampler/ Tale of Two Cities blocks
  7. Serendipity Lady Quilt

Ready for Quilting
Wow! Everything on this list is new, as in it was never on the original 26 Projects list.

  1. Christmas table runner: Basted; needs quilting and binding. I am still planning on free motion quilting this myself for practice.
  2. Red and Black Improv Quilt!

In Process
The  ‘In Process’ is used to denote projects on which I am actively working. A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP.

  • English Paper Piecing Project– half hexies
  • Stepping Stones #2 I started out using primarily Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern. I made two test blocks, but wasn’t quite happy with them, so I added a number of other reds and turquoises to the variety to make the piece more scrappy. I ending up deciding against using a solid turquoise for the background.
  • Octagon 9 Patch: still making blocks

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5″x4.5″ blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2″ squares
  • Food Quilt #3: cutting food prints
  • Pink Gradation Quilt: cutting 2.5″x4.5″ pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and was thinking about it before I went to sleep the other night. It isn’t started, but I am really trying hard not to start it.
  • Windmill quilt: Still hunting and gathering. I am cutting a variety of greys for the background,to preserve the pattern. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps

What’s on your list?

Design Wall Monday – mid October

I haven’t posted a Design Wall Monday for awhile, because there is no point in posting a boring design wall. I don’t think you should look at a boring design wall.

Design Wall Monday -10/19/2015
Design Wall Monday -10/19/2015
  1. Flying Geese – these are the most recent Flying Geese from my exchange with TFQ.

2. Stepping Stone block. I just put it up there for inspiration and because I like these blocks.

3. Most recent FOTY patches

4. Newest donation blocks

5. 3rd Carpenter’s Wheel block

6. 1st Carpenter’s Wheel block, which looks more like a quatrefoil

7. 2d Carpenter’s Wheel block

8. Donation blocks in process

I think my design wall looks quite cheerful at the moment and that pleases me. What project is on your design wall? Leave a comment with a link to a picture of your design wall.

I am linking up with the Patchwork Times by Judy Laquidara.

October 2015: 26 Projects

Finished 2015 Quilt Projects

Finished 2015 non-Quilt Projects

Still WIPs
I still have WIPs. Who doesn’t, after all, but the list is getting a lot smaller.

  1. Aqua-Red SamplerFrances and I finished the Basket block and you can make one as well by looking at the tutorial series. Now I am tasked with doing a tutorial on partial seaming.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, it is in a prominent location so I have easy access. I was thinking about how this was veering in the direction of being one of my ‘masterpieces,’ but now that it has languished for so long it just looks old and dated. 🙁
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this project either, but I do think about it.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have been feeling like I need to finish this piece as it should be a good reminder to keep in my office.
  5. Under the Sea: class project; like the design, but not the colors. Still a possibility for abandonment. Just can’t seem to pull the trigger.

Ready for Quilting
Wow! Everything on this list is new, as in it was never on the original 26 Projects list.

  1. Christmas table runner: Basted; needs quilting and binding. I am still planning on free motion quilting this myself for practice.
  2. FOTY 2014: at the quilter

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on a project and that is defined as“In Process.”

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5″x4.5″ blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2? squares
  • Pink Gradation Quilt: cutting 2.5″x4.5″ pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and was thinking about it before I went to sleep the other night. It isn’t started, but I am really trying hard not to start it.
  • Windmill quilt: Still hunting and gathering. I am cutting a variety of greys for the background,to preserve the pattern. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps

What’s on your list?