Triple Stars Again

In between putting together En Provence, I made some more Triple Star blocks. I have about six done and have to cut some more pieces to make more. I have ten more to make. They are sewn together pretty quickly with all the pieces cut.

This pattern is from Scrap-Basket Beauties by Kim Brackett. Frances turned me on to this author. There is at least one other scrap quilt in this book I would consider making.

Triple Star Test Block

Triple Star Test block - half sewn
Triple Star Test block – half sewn

I made another cutting mistake on the Triple Star and decided it was time to make a test block. I laid out two blocks so I could see what I was working on and came up with some great blocks.

I fooled around with the colors until I was happy and began sewing.

I am really happy I made the test block. Even laying it out on the design wall would have been helpful. This block is not difficult, but it is confusing. Still, the effect is really great.

Triple Star - first block sewn
Triple Star – first block sewn

The block came out really well. I am not sure about that mustardy color and may limit it. I am hoping that it will enhance the other colors. Not sure sure yet.

26 Projects List – September Edition

Finished 2017 Quilt Projects

Finally! I have at least one finished project! I finished the Peacock and entered it into PIQF.

The art quilt is nearly finished, but I can’t put it in the done pile yet.

Finished 2017 Non-Quilt Projects
While finished quilts are thin on the ground, as you know, I have been sewing and I have finished a lot of small projects. I am working on quilts and t I plan to make more small projects this year.

Shockingly, the above along with donation blocks and tops is about XX yards of fabric this year and I am not in the black in terms of usage.

Doing Good

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.

  • City Sampler – blocks all made. Need to sash the blocks and finish putting the top together. Due to some issues I had with my seam allowance, some of the blocks are smaller than others, so I will have to adjust them in some way – either adding a piece or two to the block or with sashing. I did actually put the sashing and the blocks in my bag for Sew Day yesterday. I just didn’t get to working on them. I need to press the VERY large piece of backing fabric and it was just too hot.
  • Dots & Stripes HST Quilt (or Something) – half square triangle blocks are made. I laid them out and see what is what with them.
  • English Paper Piecing Project– half hexies – I am still making stars. I am still using the big stack of fabrics I cut over Thanksgiving to make them, though I am starting to run out and I will need to cut more. I am filling in the weird shape I talked about last time. Next up, adding a border to one side to keep me from making it a weird shape again. I need to find the triangle papers and the fabric I planned to use.
  • En Provence – I finished the the fourth clue and am in the process of pressing and trimming HSTs required for the 5th clue. I think the end is in sight!
  • FOTY 2016 – I didn’t capitalize on my excitement after seeing the Ellsworth Kelly exhibit and now I have lost that rush. I still need to get on it. 9 months into the year and I am still not done.
  • Lobster – I still have more stitching to do and then I need to quilt it.
  • Triple Star: I am sewing the pieces in between  other projects.
  • Under the Sea: class project; like the design and am happier with the colors. I had an idea for it, but got another idea last week at Craft Night that might be better.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

    1. Aqua-Red Sampler – I need to lay the blocks out and put the piece together.
    2. BAMaQG IRR – this was never on the list before, but I have clearly been working on it for a long time. I think the last time I even really thought about it was in June of 2016 when Ruth returned it to me. The last post has some good ideas about what I need to do next.
    3. BAMaQG Color Round Robin – this was just returned to me and I think I will just finish it and send it off to a friend who has a 1 year old.
    4. Octagon 9 Patch: It is ready to put together. I could have used it as leaders and enders for a number of different projects I have going. I didn’t, mostly because I have a lot I can use as leaders and enders. Not sure what I am waiting for. Do I want to lay out the blocks more carefully? I actually have a plan for it, so I should get on it. I should do a lot of things.
    5. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, I did bring it to the 2017 CQFA Retreat as a potential project. It is still in a prominent location so I have easy access. I plan to bring it to the BAMaQG retreat.
    6. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. No progress.
    7. Pies and Points from Victoria Findlay Wolfe class. No further progress. I did wash the background fabric I found when I went to Portland, so I am ready to cut. I need to focus on this and it is not up high enough on the list yet.
    8. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I am stalled on this again. Again, I didn’t capitalize on the excitement I got from my career counselor and now the feeling is lost.
    9. Serendipity Lady Quilt: no progress.
    10. Stepping Stones #2 – I am still ready to make the border blocks , but haven’t gone beyond designing them yet.
    11. Lozenge quilt – need to trim blocks.

Ready for Quilting

  • Carpenter’s Wheel – I took this to Colleen’s a few weeks ago and am waiting for her to get back to me. I am hoping it will take less time than the Peacock.

In Quilting Process

  • Thanksgiving tablemat – I started quilting this piece at the 2017 CQFA Retreat. I made good progress, but it isn’t finished yet. It will be another BAMaQG retreat project.
  • Theoretically, the Tarts Come to Tea is in the quilting process, though I haven’t worked on it in a while.  See above.

Binding

Down the Drain – the binding was machine sewed on last week and now I need to hand stitch it.

Hunting and Gathering

  • 30 Something: I am still cutting 1.5 inch squares. I am pretty sure I have the 800 I need, but I am not ready to sew these yet, so whenever I have a chance I cut more. It will give me choice when the time comes. I’ll have to think up a new name, too.
  • Blue Gradation Quilt: cutting 2.5 inch x 4.5 inch blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2 inch squares. I used a lot of these squares for En Provence, so I will need to cut more.
  • Pink Gradation Quilt: cutting 2.5 inch x 4.5 inch pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. I bought a new template, so I should be able to get going again

Other

  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space (and desire) in my schedule.

What’s on your list?

Triple Star Progresses

I had a few minutes to sew on Friday night after work and I blew through about 30 pieces for the Triple Star quilt. Not tons, but some progress, which felt good.

Triple Star - August 2017
Triple Star – August 2017

I have to admit I was avoiding quilting on the art quilt. I had taken off the walking foot in order to finish the star donation quilt and just drifted over to piecing rather than be disciplined about quilting. I have to give myself a break. This is supposed to be fun and I have been driving myself.

I was pleased to do some piecing. I received the Chroma finally, so I could cut the rest of the large rectangles. Now I am in the process of sewing (using the flippy corners method) 2.5″ squares onto two sides of the rectangles to make a parallelogram. I need a lot of them so it is taking forever. I might sew a sample block just to ease the mindlessness. I have no excuse to be bored 1) because I can switch to other projects and 2) I just started!

Other Posts on the Triple Star:

Triple Star Progress – July 6, 2017
Triple Star – June 20, 2017

Carpenter’s Wheel Top Finished

Carpenter's Wheel top finished
Carpenter’s Wheel top finished

A few weeks have gone by since I finished this top. I am not sure why I didn’t post it, but I am now.

The piece, as I have said a million times is HUGE. This means that it is hard to photograph. It further means that you get a glimpse of some of the furniture that needs to be recovered in the photo. 😉

I am pleased with the way it came out. The back is done (no photo, sorry), the binding is done and I am working on a sleeve.

I made The Peacock sleeve this week and thought it would be great to just make the Carpenter’s Wheel sleeve as well. It would be ready for hand sewing and I wouldn’t have to stop what I was doing to make a sleeve. I haven’t completed it yet, though it is in process.

Triple Star Progress

Lots of prep this week.

I suppose that is what has to happen at some point. I know I mitigate massive bouts of cutting by breaking it up, but occasionally, I can’t get away from it.

Triple Star background fabric
Triple Star background fabric

In addition to everything else I did at Sew Day, I also cut background squares for the Triple Star.

This was a task I really needed to do to make anymore progress on the piece, but was also reluctant to do due to space considerations. At Sew Day, I commandeered a large mat and table. I was able to lay out the book, the finished pieces, my rulers and still have space to cut. It was great and I got the job done quickly.

I still have foreground fabric to cut as I have been focusing my cutting on the 2.5″ x 6.5″ rectangles and using the Alison Glass Sun Prints layer cake. Before I can do much more I need to cut some of the smaller foreground pieces from other pieces. I don’t want to make a one fabric line quilt. I want it to be more controlled scrappy like the version I saw at Back Porch.

Triple Star Rectangle-Spikes
Triple Star Rectangle-Spikes

I did a little piecing using the pieces I cut and they are looking good so far. I am using the Janome 6600, which I talked about yesterday. They came out perfectly. There was no fighting with the machine. I used the “flippy corners” method and the machine did not eat the corners. It was a relatively painless experience.

26 Projects List – July 2017 Edition

Finished 2017 Quilt Projects

Still no finished projects quite yet. The Peacock binding is finished almost puts me back in the black in terms of fabric usage. I have to make the sleeve and that should take some yardage as well. My fabric used list is still really suffering from being away from my sewing machine, tempting new quilt shops and just generally fabulous fabrics.

Finished 2017 Non-Quilt Projects
While finished quilts are thin on the ground, as you know, I have been sewing and I have finished a number of small projects. I am working on quilts, but I plan to make more small projects this year.

Shockingly, the above along with donation blocks and tops is about 50 yards of fabric this year and I am not in the black in terms of usage.

Doing Good

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.

  • City Samplerblocks all made. Need to sash the blocks and finish putting the top together. Due to some issues I had with my seam allowance, some of the blocks are smaller than others, so I will have to adjust them in some way – either adding a piece or two to the block or with sashing. I have the sashing fabric and it is washed, so the only thing stopping me from getting going is time and other projects.
  • Dots & Stripes HST Quilt (or Something) – half square triangle blocks are made. I have to lay them out and see what is what with them.
  • English Paper Piecing Project– half hexies – I am still making stars. I am still using the big stack of fabrics I cut over Thanksgiving to make them. This piece is a weird shape otherwise I would just finish it and move on.
  • En Provence – I finished the the third clue and plan to cut more Peaky and spikes at Craft Night for the next clue.
  • FOTY 2016 – I knew it was time to start arranging it and didn’t realize I was stalled until I saw Ellsworth Kelly’s Spectrum Colors Arranged by Chance, 1951-53. Now I am excited again about it, so it is closer to the top of the list. 6 months into the year and I need to get on it.
  • Lobster – I still have more stitching to do and then I need to quilt it.
  • Triple Star: I am cutting out the pieces in between  other projects.
  • Under the Sea: class project; like the design and am happier with the colors. I worked on it a little at Craft Night recently.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

    1. Aqua-Red Sampler – I need to lay the blocks out and put the piece together.
    2. BAMaQG IRR – this was never on the list before, but I have clearly been working on it for a long time. I think the last time I even really thought about it was in June of 2016 when Ruth returned it to me. The last post has some good ideas about what I need to do next.
    3. Octagon 9 Patch: It is ready to put together. I could have used it as leaders and enders for a number of different projects I have going, but I didn’t. Not sure what I am waiting for. Do I want to lay out the blocks more carefully? I actually have a plan for it, so I should get on it. I should do a lot of things.
    4. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, I did bring it to the 2017 CQFA Retreat as a potential project. It is still in a prominent location so I have easy access. I just signed up for the BAMaQG retreat, so perhaps that will be the time.
    5. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. No progress.
    6. Pies and Points from Victoria Findlay Wolfe class. No further progress. I did wash the background fabric I found when I went to Portland, so I am ready to cut. I need to focus on this and it is not up high enough on the list yet.
    7. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. As mentioned my career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
    8. Serendipity Lady Quilt: no progress.
    9. Stepping Stones #2 – I am ready to make the border blocks , but haven’t gone beyond designing the blocks yet.
    10. Lozenge quilt – need to trim blocks.

Ready for Quilting

  • Carpenter’s Wheel – I took this to Colleen’s last week and am waiting for her to get back to me. I am hoping it will take less time than the Peacock.

In Quilting Process

  • Thanksgiving tablemat – I started quilting this piece at the 2017 CQFA Retreat. I made good progress, but it isn’t finished yet. Another BAMaQG retreat project?
  • Theoretically, the Tarts Come to Tea is in the quilting process, though I haven’t worked on it in a while. It did come with me to Retreat and almost made it high enough on the list to get some love.

Binding

Peacock Quilt – finished quilting; have to pick up from my quilter, so I can bind.

Hunting and Gathering

  • 30 Something: I am still cutting 1.5 inch squares. I am pretty sure I have the 800 I need, but I am not ready to sew these yet, so whenever I have a chance I cut more. It will give me choice when the time comes. I’ll have to think up a new name, too.
  • Blue Gradation Quilt: cutting 2.5 inch x 4.5 inch blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2 inch squares. I used a lot of these squares for En Provence, so I will need to cut more.
  • Pink Gradation Quilt: cutting 2.5 inch x 4.5 inch pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. I bought a new template, so I should be able to get going again

Other

  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space (and desire) in my schedule.

What’s on your list?

26 Projects List – June 2017 Edition

Finished 2017 Quilt Projects

Still none yet. Still sad, though I am getting the Peacock back soon, which after binding, should put me back in the black in terms of fabric usage. I hope.  My fabric used list is still really suffering from frequent travel, tempting new quilt shops and fabulous fabrics.

Finished 2017 Non-Quilt Projects
While quilts are thin on the ground, I have been sewing and I have finished sewing a lot of small projects. I think that trend has mostly ended, but I expect to make a few more small projects this year.

Shockingly, the above along with donation blocks and tops is about 50 yards of fabric this year and I am not in the black in terms of usage.

Doing Good

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.

  • Carpenter’s Wheel blocks – I am almost finished putting the blocks together. I had a goal of Friday, but my quilter is going out of town before I can finish the top, back and binding, so I might be stalled again.
  • City Samplerblocks all made. Need to sash the blocks and finish putting the top together. I have the fabric I will use and I have no washed it, so nothing is stopping me from getting going.
  • English Paper Piecing Project– half hexies – I am still making stars. I am still using the big stack of fabrics I cut over Thanksgiving to make more stars. This piece is a weird shape otherwise I would just finish it and move on.
  • En Provence – I am well into the third clue clue is finished. I have sewn over 120 blue four patches and have about 40 to go. I have been focusing on the Carpenter’s Wheel, so am stalled on this once again. I am, however, cutting more pieces in between the Carpenter’s Wheel.
  • FOTY 2016 – I knew it was time to start arranging it and didn’t realize I was stalled until I saw Ellsworth Kelly’s Spectrum Colors Arranged by Chance, 1951-53. Now I am excited again about it, so it is closer to the top of the list. 6 months into the year and I need to get on it.
  • Lobster – I still have more stitching to do and then I need to quilt it.
  • Octagon 9 Patch: ready to put together. Not sure what I am waiting for. Another leaders/enders project or do I want to lay out the blocks more carefully?
  • Under the Sea: class project; like the design and am happier with the colors. I still haven’t worked on it since February.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

    1. Aqua-Red Sampler – I need to lay the blocks out and put the piece together.
    2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, I did bring it to the 2017 CQFA Retreat as a potential project. It is still in a prominent location so I have easy access.
    3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. No progress.
    4. Pies and Points from Victoria Findlay Wolfe class. No further progress. I did wash the background fabric I found when I went to Portland, so I am ready to cut. I need to focus on this and it is not up high enough on the list yet.
    5. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
    6. Serendipity Lady Quilt: no progress.
    7. Stepping Stones #2 – I am ready to make the border blocks , but haven’t gone beyond designing the blocks yet.
    8. Lozenge quilt – need to trim blocks.

Ready for Quilting

  • Nothing

In Quilting Process

  • Thanksgiving tablemat – I started quilting this piece at the 2017 CQFA Retreat. I made good progress, but it isn’t finished yet.
  • Theoretically, the Tarts Come to Tea is in the quilting process, though I haven’t worked on it in a while. It did come with me to Retreat and almost made it high enough on the list to get some love.

Binding

Peacock Quilt – finished quilting; have to pick up from my quilter, so I can bind.

Hunting and Gathering

  • 30 Something: I am still cutting 1.5 inch squares. I am pretty sure I have the 800 I need, but I am not ready to sew these yet, so whenever I have a chance I cut more. It will give me choice when the time comes. I’ll have to think up a new name, too.
  • Blue Gradation Quilt: cutting 2.5 inch x 4.5 inch blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2 inch squares. I used a lot of these squares for En Provence, so I will need to cut more.
  • Pink Gradation Quilt: cutting 2.5 inch x 4.5 inch pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. I bought a new template, so I should be able to get going again

Other

  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space (and desire) in my schedule.

What’s on your list?

26 Projects List – May 2017 Edition

Well, hello! It has been awhile since I confessed to my UFO and WIP list. February, as a matter of fact.

Finished 2017 Quilt Projects

None yet. Sad I know. My fabric used list is really suffering.

Finished 2017 Non-Quilt Projects

Shockingly, the above along with donation blocks and tops is about 50 yards of fabric this year and I am only a little bit in the black in terms of usage.

Doing Good

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.

  • Carpenter’s Wheel blocks – The  blocks are completed, as you know and I am well into putting the blocks together.
  • City Samplerblocks all made. Need to sash the blocks and finish putting the top together. I have the fabric I will use and I have no washed it, so nothing is stopping me from getting going.
  • English Paper Piecing Project– half hexies – I am still making stars. I am still using the big stack of fabrics I cut over Thanksgiving to make more stars. This piece is a weird shape otherwise I would just finish it and move on. I still a month of traveling with DH and he has plans for other trips where he has no duties, though there is still some negotiation to made on that.
  • En Provence – Second clue is finished. I have decided to use blue where the purples are in Bonnie’s version. The blues are cut and I just need to sew.
  • FOTY 2016 – It is still time to start arranging it. I wanted to do it immediately after finishing the Peacock top, but with my design wall issues, I don’t think I will.
  • Lobster – have more stitching to do and then I need to quilt it.
  • Octagon 9 Patch: ready to put together. Not sure what I am waiting for. Another leaders/enders project or do I want to lay out the blocks more carefully?
  • Under the Sea: class project; like the design and am happier with the colors. I haven’t worked on it since February.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

    1. Aqua-Red Sampler – I need to lay the blocks out and put the piece together.
    2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, I did bring it to the 2017 CQFA Retreat as a potential project. It is still in a prominent location so I have easy access.
    3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. No progress.
    4. Pies and Points from Victoria Findlay Wolfe class. No further progress. I did wash the background fabric I found when I went to Portland, so I am ready to cut. I need to focus on this and it is not up high enough on the list yet.
    5. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
    6. Serendipity Lady Quilt: no progress.
    7. Stepping Stones #2 – I am ready to make the border blocks , but haven’t gone beyond designing the blocks yet.

Ready for Quilting

  • Nothing

In Quilting Process

  • Peacock Quilt – at Colleen’s
  • Thanksgiving tablemat – I started quilting this piece at the 2017 CQFA Retreat. I made good progress, but it isn’t finished yet.
  • Theoretically, the Tarts Come to Tea is in the quilting process, though I haven’t worked on it in a while. It did come with me to Retreat and almost made it high enough on the list to get some love.

Binding

None

Hunting and Gathering

  • 30 Something: I am still cutting 1.5 inch squares. I am pretty sure I have the 800 I need, but I am not ready to sew these yet, so whenever I have a chance I cut more. It will give me choice when the time comes. I’ll have to think up a new name, too.
  • Blue Gradation Quilt: cutting 2.5 inch x 4.5 inch blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2 inch squares. I am going to use these squares for En Provence, so I will need to cut more, I think.
  • Pink Gradation Quilt: cutting 2.5 inch x 4.5 inch pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. I bought a new template, so I should be able to get going again

Other

  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space (and desire) in my schedule.

What’s on your list?

Carpenter’s Wheel – 2 Rows Together

The other day I talked about making the two sections of section 2. After I did that it took me a few days to sew section 2 together and then sew that large piece to section 1.

Carpenter's Wheel - Section 1 & 2 sewn together
Carpenter’s Wheel – Section 1 & 2 sewn together

I still need to make and add Section 3. I have barely any 4 patches left for the background, so I have to sew those blocks together first.

I am stupidly pleased with this section. Even more so because the feeling of having crossed a huge hurdle is even stronger now that I can see this section laid out. Of course, I may never be able to see the entire top as it is so large. I might have to move the dining room table and get a ladder to take future photos.

Carpenter’s Wheel -Section 2

With two more seams, section 2 will be finished and attached to section 1 making one large section.

To get there, I have to sew two seams. Before that I finished all of the section two background blocks. As a bonus, I feel like I surpassed a major hurdle. The feeling of slogging through and never making progress was strong, but finishing this section made the light at the end of the tunnel visible.

Section 2: right blocks
Section 2: right blocks

It is so odd how I can feel like a project will never end, then suddenly, with no warning, I see the end coming.

Design Wall Monday

Design Wall, March 26, 2017
Design Wall, March 26, 2017

I think it might have been last November that I did a design wall post. I am a little short of content, not having finished or really worked on anything worth showing recently. Some projects are actually worth showing, but not in a recognizable stage. I kind of feel like this whole year, so far, has been dedicated to process and some mindless sewing.

I had to work hard yesterday to fill it up so it would be interesting for you to look at. Not that I hadn’t planned to sew a lot anyway, but you gave me true purpose.

Design Wall, March 26, 2017 annotated
Design Wall, March 26, 2017 annotated

I was pleased and a little shocked that none of the major projects on my design wall were there last November. I am pleased that I have made some progress.

  1. The Lobster has been up there awhile, but not 5 months, which is a relief. I have been feeling twinges lately about continuing to stitch on it, so you may see some progress in the coming weeks.
  2. Latest standard donation blocks
  3. Latest patches for FOTY 2017
  4. Four Carpenter’s Wheel blocks I made yesterday
  5. Latest non-standard donation blocks. I ran out of white squares. While I have more charm packs and can cut them, I didn’t want to stop and take the time. I have been thinking of making some postage stamp blocks with all colored 2.5″ squares and no white. I seem to have a lot of black and dark grey squares, so I decided to head in that direction by making a couple of blocks with those darker colors as background.
  6. The En Provence square is still on the design wall in an effort to keep it on my mind. As I think I mentioned, the Peaky and spike patches are done and I need to move on to clue 3. I am not quite there yet, so it is up there as a reminder.

I am linking up with the Patchwork Times.

Carpenter’s Wheel – First Piece

Carpenter's Wheel - first piece
Carpenter’s Wheel – first piece

Hard on the heels of the Peacock was a deadline for the Carpenter’s Wheel. Since I had started thinking of the background for each block in terms of low volume prints, there was a lot of text fabric included.When the text Challenge was announced at my modern guild, I immediately thought of this piece. It wasn’t exactly made specifically for this challenge, but it fit the theme and the blocks were just hanging around, so Text challenge quilt it was.

That meant that I had to get some of it done before the big reveal, which was Saturday. I couldn’t be there due to #politicalwifery. Still, I had options for showing it.

I used some mini charms, which I bought in Oregon, to get the ball rolling, but picked up other text fabrics along the way as well. A few weeks ago, I spent some quality time with the Accuquilt and the 2.5 inch die cutting, what I hoped were, enough squares to make 3 background blocks.

Carpenter's Wheel - Feb 2017
Carpenter’s Wheel – Feb 2017

I refused to compromise my vision, which started with the layouts I worked on in the spring of last year. I wanted some good texture int he background, so multiple squares, rather than big squares of fabric it was to be. I began using the 2.5 inch squares as leaders and enders as I finished the back for The Peacock. I made a stack of 4 patches, which later turned into 3 background squares.

Carpenter's Wheel background block
Carpenter’s Wheel background block

I wanted to see how 4 inch squares would look mixed in. I chose the fabrics carefully and fussy cut in some cases. I thought they fit in and didn’t scream, so I used a couple in each block. This make the piecing go a little faster and add a little relief to the background.

I had to sew into the evening on Thursday in order to give it to my SIL on Friday to take to the meeting. I succeeded and still got to spend time with DH. I have gotten some very nice comments on Instagram and hope, even if unfinished, it is well received at guild.

Peacock Top Complete

Peacock top Complete
Peacock top Complete

I finally finished the Peacock top. The photo looks a little odd, because my design wall isn’t large enough for the whole top so it is bent around the corner and taped to the fabric closet door.  Still, done is done albeit large.

I also finished the back this past weekend. I knew it would take awhile so I started after I returned from the CQFA meeting and the BAM Sew Day. I spent about 4 hours and got about half of it done. The rest of it took me all day on Sunday. I thought about this and decided that the smaller the pieces I have to work with the more time the back takes. I had used most of the large-ish pieces on Saturday, so I was left with rather small pieces. I thought I would be annoyed, but I sewed, actually, quite happily on the back.

I needed to get it done before the CQFA Retreat, because someone wanted to buy my design wall. That didn’t work out so my Pind design wall is available for sale, if you are interested. It works great and is in great shape; it just isn’t large enough for me. Let me know if you are interested.

26 Projects – February 2017 Edition

I am clearing up my workroom a bit after taking down my large design wall and finding a plethora of odds and ends behind it. In the course of cleaning, I am assembling fabrics to donate, which count in the ‘used’ (e.g. no longer in the stash) column of my fabric spreadsheet.

Finished 2017 Quilt Projects

None yet

Finished 2017 Non-Quilt Projects

Doing Good

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.

  • Carpenter’s Wheel blocks – I made a few more blocks and am ready to put the blocks together. This means making text/low volume blocks, which I want to do quickly so I can also get this piece to Colleen.
  • City Samplerblocks all made. Need to sash the blocks and finish putting the top together. I have the fabric I will use, but I think it needs to be washed.
  • English Paper Piecing Project– half hexies – I am still making stars. I am using the big stack of fabrics I cut over Thanksgiving to make more stars. This piece is a weird shape otherwise I would just finish it and move on. I do still have 4 months of traveling with DH.
  • En Provence – Working on the second clue, I think. I put it off while I finished The Peacock as the mind shift was making me a little crazy.
  • FOTY 2016 – time to start arranging it. I wanted to do it immediately after finishing the Peacock top, but with my design wall issues, I don’t think I will.
  • Lobster – have more stitching to do and then I need to quilt it.
  • Octagon 9 Patch: ready to put together. Not sure what I am waiting for. Another leaders/enders project or do I want to lay out the blocks more carefully?
  • Peacock Quiltoff the design wall and the top is sewn together. Next step is to make the back. My deadline is Feb 6 as I want to take it to Colleen that week.
  • Under the Sea: class project; like the design and am happier with the colors. I bought a few spools of Sue Spargo’s embroidery thread and continue to embroider. I want to finish it soon, though the piece does keep calling for more embroidery.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

    1. Aqua-Red Sampler – The partial seaming tutorial was finished in September. Now I need to lay the blocks out and put the piece together.
    2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, I did bring it to the 2017 CQFA Retreat as a potential project. It is still in a prominent location so I have easy access.
    3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. No progress.
    4. Pies and Points from Victoria Findlay Wolfe class. No further progress. I did wash the background fabric I found when I went to Portland, so I am ready to cut. I need to focus on this and it is not up high enough on the list yet.
    5. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have stopped feeling like I need to finish this piece. I am not ready to give up on it yet. I think it really needs major surgery.
    6. Serendipity Lady Quilt: no progress.
    7. Stepping Stones #2 – I am ready to make the border blocks , but haven’t done anything yet.

Ready for Quilting

  • Nothing

In Quilting Process

  • Thanksgiving tablemat – I started quilting this piece at the 2017 CQFA Retreat. I made good progress, but it isn’t finished yet.
  • Theoretically, the Tarts Come to Tea is in the quilting process, though I haven’t worked on it in a while. It did come with me to Retreat and almost made it high enough on the list to get some love.

Binding

None

Hunting and Gathering

  • 30 Something: I am still cutting 1.5 inch squares. I am pretty sure I have the 800 I need, but I am not ready to sew these yet, so whenever I have a chance I cut more. It will give me choice when the time comes. I’ll have to think up a new name, too.
  • Blue Gradation Quilt: cutting 2.5 inch x 4.5 inch blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2inch squares
  • Pink Gradation Quilt: cutting 2.5 inch x 4.5 inch pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. I bought a new template, so I should be able to get going again

Other

  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space (and desire) in my schedule.

What’s on your list?