![La Pass Month 8 basted](https://artquiltmaker.com/blog/wp-content/uploads/2022/03/20220305_193559_wm-sm-209x300.jpg)
I cut and basted a few of those damn triangles at a couple of meetings last week, but did the bulk of the work at Sew Day. I divided up the different shapes and alternated the skinny triangles with all the other shapes. I got the basting done and was able to do a bit of stitching before Sew Day was over.
I also sewed in the evening, so I have a good start for Month 8.