February 2014 To Do List

I had 16 items on my list last time. I have removed four that I completed prior the January To Do List post) and have crossed off the ones I completed since January 4. I also added two new ones, so it doesn’t look like I made much progress.

This list is in no particular order. ;-)

To Do List:

  1. Sew on sleeve for Original Bullseye
  2. Sew green and red striped 8 pointed star
  3. Sew white on black wavy line 8 pointed star
  4. Layer, baste Christmas table runner
  5. Quilt Christmas table runner
  6. Quilt/stitch fish postcard
  7. Wash fabric (I am guessing this will never be off the list) ;-)
  8. Make stiff bucket or box for TP in main bath
  9. Make stiff bucket or box for TP in second bath
  10. Dragon Box (gift)
  11. Anna Maria Horner Multi-tasker tote (gift-due Holiday 2013- oops)
  12. Make 3 notepad covers (gifts)
  13. Sew coffee patch to red bag
  14. Sew coffee patch to bathrobe

To see the 26 Projects Lists, which list quilt WIPS, visit the January update