February 2014 To Do List

I had 16 items on my list last time. I have removed four that I completed prior the January To Do List post) and have crossed off the ones I completed since January 4. I also added two new ones, so it doesn’t look like I made much progress.

This list is in no particular order. ;-)

To Do List:

  1. Sew on sleeve for Original Bullseye
  2. Sew green and red striped 8 pointed star
  3. Sew white on black wavy line 8 pointed star
  4. Layer, baste Christmas table runner
  5. Quilt Christmas table runner
  6. Quilt/stitch fish postcard
  7. Wash fabric (I am guessing this will never be off the list) ;-)
  8. Make stiff bucket or box for TP in main bath
  9. Make stiff bucket or box for TP in second bath
  10. Dragon Box (gift)
  11. Anna Maria Horner Multi-tasker tote (gift-due Holiday 2013- oops)
  12. Make 3 notepad covers (gifts)
  13. Sew coffee patch to red bag
  14. Sew coffee patch to bathrobe

To see the 26 Projects Lists, which list quilt WIPS, visit the January update

Author: Jaye

Quiltmaker who enjoys writing and frozen chocolate covered bananas.