Working Through the Worktable Projects

A few weeks ago, I wrote a post about what I was working on. It wasn’t my normal 26 Projects post, but just the current projects that were in the forefront of my mind and needed to be written down. Now I have made some progress and need to follow up and see what is what.

The following projects were on the list:

Since then I have worked hard. You have seen the posts about the different projects, but here is an update.

Box Full of Letters and the Food Quilt #2 are ready to go to the quilter.

The Field Day Zipper top is together (look for a post soon), but I still have to put the borders on the top and make the back.

I haven’t worked on the Improv Quilt at all.

I also didn’t get to the Improv quilt yet, but I have been thinking about it. The fabric and strips have also been in my way, which means that I need to work on the B blocks and get the fabric out of the way.

I haven’t touched the Octagon 9 Patch blocks. I need more 9 patches and haven’t cut the colored pieces of fabric yet. That is a bit of a hold up.

I have made a few more Stepping Stones blocks and am using the pieces as leaders and enders. I am almost done with Block #8 and need to make at least 16 more blocks, lots of leaders and enders action coming.

Finally, I have added a couple of pieces to the Pinkalicious Journal Cover, but only in a desultory manner, not with any purpose.

So some progress, but not complete progress. It’s ok as I am working and that is what counts.