
It has been awhile since I posted an update on this project. Nonnie asked about it during the Black Friday Sew-in and I thought it would be a good time to do an update.
I am shocked that the last time I posted about this project was in September. I am also shocked that it is December and I am about to need to start sewing this baby together.
One thing that has happened is that I have washed very little fabric this Fall. I don’t want a huge pile hanging around the workroom waiting to be pressed, so I haven’t been washing fabric unless I need it. A lot of what you see in the photo (left) comes from the various projects I have worked on recently, most specifically the Scrapitude project. I’ll need to wash some fabric soon as I’d like to make sure some of it gets in this project.
I am really shocked that in a month and a half I’ll be sewing this project together. That is the plan anyway. I can’t go to the CQFA Retreat (super sad face), so I am going to have to mark out specific time to sew it together.
Many super sad faces. 🙁 Maybe we can do another one later in the year.
If the BAMQG retreat fits with my DH schedule, I will make that one this time.
What an interesting project. I had to go back to the previous posts to get up to speed on this quilt. I like the idea.
Thank you for working your way through the posts!
Can’t wait to see what you do for this year.
You’ll be surprised! I have a different idea for this year. I hope it works.