As you know we have been earning merit hexies in the guild. I had a few minutes before I had to get ready to go out, so I designed a layout for my 2017 merit hexies.
I used the leftover basted sandwich from the Walking Foot WOW class. I laid out my hexies in a couple of pleasing ways and finally decided on this layout.
I pinned everything in place and will begin appliqueing the hexies down soon. I might have another chance to install a zipper!
I feel like I am making good progress. Compared to last time I have added a number of finishes to my list. I have finished projects that have been hanging around and nagging at me and that feels great. I am still on that trajectory, so I hope to add some more finishes to my list during April as well.
In Process
The ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them
English Paper Piecing Project– half hexies – I made a little bit of progress on Friday night. I think I might be back in the saddle on this.
Stepping Stones #2 – Now that the BAMaQG IRR is off the design wall, I am planning to put this back on it and work on it. I have a loose goal of completing two quilt tops (+backs, binding) before April 9th and this is one I’d like to complete. If I am going to make my goal, I need to get busy. I need to cut more patches and sew more border blocks.
Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.
Aqua-Red Sampler – I need to lay the blocks out and put the piece together. No new progress.
City Sampler – blocks all made. Need to sash the blocks and put the top together. Due to some issues I had with my seam allowance, some of the blocks are smaller than others, so I will have to adjust them in some way – either ripping and resewing, adding a piece or two to the block or with sashing. This is sort of a sticking point and while I consider this quilt ‘in process’ I hadn’t worked on it in awhile until I took the blocks to the BAM Sew Day and started measuring. Once I know what I am facing for each block, I can move forward. No new progress.
FOTY 2017 – pieces cut. Need to layout and start piecing. No new progress.
Handbag Sampler – this is a project about which I had forgotten. I actually don’t know exactly where the blocks are hiding. I have an idea and will crawl up in the far reaches of my fabric closet soon and see if I can find them. I haven’t even found a picture of all the blocks. The blocks were teaching samples when I taught a sampler class the time before I started writing the quilt class sampler tutorials.
Lobster – I still have more stitching to do and then I need to quilt it.
Octagon 9 Patch: I am continuing to sew pairs together as leaders and enders. I have gotten over my concerns, because I want to make progress. Minimal amount of new progress.
Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. No progress.
Pies and Points from Victoria Findlay Wolfe class. I need to focus on this and it is not up high enough on the list yet. No new progress.
Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I am still stalled on this again. I have to analyze why I want to finish this piece.
Under the Sea: class project; like the design and am happier with the colors. I have a new idea for it, which is to make a pillow and gift it to a friend.
Black and Red quilt – This came about because of two other projects. I made a whole bunch of bias tape as part of my failed attempt at doing the Mighty Lucky Club a few years ago. Another part of the inspiration came from my class with Tina of Little Blue Cottage fame. This was going to be for a nephew, but I think it will be for one of my SILs and BILs. I have rectangles cut and some bias tape ready. My next step is to sew the bias tape to the rectangles like pickup sticks. I don’t have any photos of this, so you’ll have to trust me.
Small Projects in Process
1 gift Sew Together Bag as a gift – nothing cut
Tool Tote – I bought the pattern at QuiltCon and started cutting it out at Sew Day in March
Ready for Quilting
nothing right now
In Quilting Process
BAMaQG IRR –The sandwich has been basted. I plan a couple of lines of machine quilting and then I will do the rest by hand quilting it using Big Stitch. I hope I remember how to Big Stitch.
Theoretically, the Tarts Come to Tea is in the quilting process, though I haven’t worked on it in a while. See above.
Triple Star – Finished piecing and is at the quilter
Binding
Nothing now
Hunting and Gathering
30 Something: I am still cutting 1.5 inch squares. I am pretty sure I have the 800 I need, but I am not ready to sew them together yet, so whenever I have a chance I cut more I cut more. It will give me choice when the time comes. I’ll have to think up a new name, too. My next step will be to figure out if I need to cut other sizes of squares and switch from cutting 1.5? squares to cutting the new size.
Blue Gradation Quilt: cutting 2.5 inch x 4.5 inch blue rectangles. It has to end sometime. I wasn’t sure I was ready to put this together, but I think I am. I might do a couple of gradation quilts in a row just to get the practice.
Blue Lemonade: cutting blue, green, purple 2 inch squares. I used a lot of these squares for En Provence, so I am slowly cutting more.
FOTY 2018: I have started cutting 2.5″ squares for the 2018 version.
Pink Gradation Quilt: cutting 2.5 inch x 4.5 inch pink rectangles
Spin Wheel: really not started, but supplies gathered. I might have to cut some more background fabrics. I probably have enough fabrics and just need to decide to start.
Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background, which required the purchase of a new template. I should be able to get going again
Other
Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space (and desire) in my schedule.
I bought some fabric, so I am down on net usage. Still gross usage is just over 90 yards (45 net; yes I have bought about 45 yards worth of fabric this year!). I am pleased, but I want to hit 50 yards net as soon as possible. If I could make it to 100 yards NET used by the end of the year, I would be ecstatic.
My half hexie EPP project has been languishing while I knit and sew on bindings, and do other handwork. It seems that I last posted about this project in July of 2017. I can’t believe I haven’t worked on it since then. I have been looking for the diamond papers I know I have that I will use to finish off the edges and create a border. I haven’t found them, though I did find the fabric, and that is discouraging. I want to get this done, so I start the La Passacaglia. I think it is silly to start another EPP project with this one in progress.
I found some inspiration on Instagram the other day for my languishing project, which encouraged me to get back in theswing. Pat Bravo posted about a piece made from half hexies that were arranged into triangles. I am not changing horses in the middle of the stream, but it was interesting to see.
I spent the night before last sewing some stars together and then adding them to my larger piece. The top and bottom are pretty straight. Right now my idea is to put diamonds on one of those edges to create the start of a border. The other edge (top or bottom) I will also border with diamonds, but not until it is wide enough for the bed or to be a large cuddle quilt. I am not yet sure what I will do with the right and left edges. I don’t think I can make them straight like the top and bottom, but I will try to get them as straight as possible.
This bag and the gift Sew Together Bags have been on my list for a long time. As usual, the cutting took forever. As I mentioned, last week, after the March Sew Day I decided to get busy and get these done.
PJ Sew Together Bag in process
I remembered, after laboring for what seemed like hours, why it has been awhile since I made any more of these. The layers you have to sew through is daunting. These are very useful bags, but a pain to make.
Last time I made some I had the following advice:
Think the strips for the long zipper would lay better if they were on the bias.
The bag needs some feature to which Wonder Clips can be clipped.
I tried a few different things and cannot get the top stitching to look good where there are many, many layers.
WonderClips are a godsend for making this project. I used about 12. They are not listed on the supply list, but I think they are essential for this bag.
Make the pincushion (mine is a little too large on this one) and the exterior at the beginning of the bag making process. It is such a hassle to stop and do the fiddly bits when you are so close to finishing.
Use a two sided zipper pull
I tried out my bias advice. The binding strips still do not lay completely flat once the bag is sewn together. It could be the difficulty of stitching through so many layers.
I would also add: make sure you don’t get an invisible zipper. I had to rip out the stitching on the main zipper several times before I got it to a point where I could stand to look at it.
I am almost finished with this bag. I am working on two others and am not sure I will ever make this bag again. I’ll probably forget the drama and make more at some point when my rose colored glasses are back on.
I finally had enough cut pieces to write a post on the Fabric of the Year 2018 piece. This year I chose a 2.5″ square so I could have a realistic chance of doing the Ellsworth Kelly style layout. The size of the pieces from Fabric of the Year 2017 makes this layout realistically impossible. First of all, I don’t have a design wall large enough to accommodate such a large piece. Second, I would have to cut all the pieces down to a square and I want to work with the subway tile shape. Third, I don’t want to wrestle such a large quilt. FOTY 2017 will probably be a monster anyway and I don’t want to add to it. It seemed better to start afresh with an idea in mind.
The 2.5″ shape also means I can get pieces out of small leftovers where needed. I am excited, though FOTY 2017 being undone still drags a bit. I am making progress on my list, so I can’t complain too much.
I decided it was time to make another Sew Together Bag for my embroidery/Big Stitch stuff. I actually decided a long time ago and just finished cutting everything out on the last Sew Day at the beginning of the month.
Sew Together Bag Panels
My first Sew Together Bag is getting stuffed and I use it a lot. I might actually have to make another one for EPP as well, but that might be going too far. The point is to have everything handy in the bag so I can grab and go. this means, I need multiple pair of scissors, etc, and I am not sure I want to buy more. We’ll see.
Sew Together Bag/Walking Foot
I am using the Quilt Barn tutorials again and the process is going pretty smoothly. That is not to say there hasn’t been some ripping and bumps, but all-in-all, the process is going well. They suggest a walking foot and since I bought all those new walking feet, I decided to take their advice this time. It is nice! The zippers are causing me very little hassle.
I am working on this project very slightly. Each time I need a leader and ender, but am not working on a donation block, I put one of these through the machine. I have a fair number now.
I am only joining one octagon block to one 9 patch block at the moment. Once I do that, I’ll see where to go next. Design wall, probably, which is full at the moment.
As I said in January, I am working on getting my quilt house in order. In February’s post, I showed progress. This means I am continuing to finish projects and tidying up my workroom. I spent time the week before last reorganizing some in process projects and putting the parts into bins. I don’t have a lot of space in my fabric closet for project bins, but making some space allows me greater access to my fabric. I also made progress on some projects, which is the whole point of this exercise.
Terrain quilt – SIL and I made the top and back and Tim quilted it. He put the binding on at March’s Sew Day
Mostly Manor HST top and back – ready for quilting by Tim
In Process
The ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.
BAMaQG IRR –The top is done and I am working on the back in preparation for quilting
English Paper Piecing Project– half hexies – I have mostly been knitting while I watch TV, but I did make some half hexies in anticipation of making another star
Stepping Stones #2 – This quilt was on the design wall, but I took it off to work on the BAMaQG IRR. I need to cutmore patches and sew more border blocks.
Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.
Aqua-Red Sampler – I need to lay the blocks out and put the piece together.
City Sampler – blocks all made. Need to sash the blocks and put the top together. Due to some issues I had with my seam allowance, some of the blocks are smaller than others, so I will have to adjust them in some way – either ripping and resewing, adding a piece or two to the block or with sashing. This is sort of a sticking point and while I consider this quilt ‘in process’ I hadn’t worked on it in awhile until I took the blocks to the BAM Sew Day and started measuring. Once I know what I am facing for each block, I can move forward
FOTY 2017 – pieces cut. Need to layout and start piecing.
Handbag Sampler – this is a project about which I had forgotten. I actually don’t know exactly where the blocks are, but I have an idea and will crawl up in the far reaches of my fabric closet soon and see if I can find them.I haven’t even found a picture of all the blocks. The blocks were teaching samples when I taught a sampler class the time before I started writing the quilt class sampler tutorials.
Lobster – I still have more stitching to do and then I need to quilt it.
Octagon 9 Patch: In the past week or so, I have started to sew pairs together as leaders and enders. I am not convinced this is a great idea, but I want to make progress, so I will make it work.
Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. No progress.
Pies and Points from Victoria Findlay Wolfe class. No further progress. I need to focus on this and it is not up high enough on the list yet.
Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I am stalled on this again. Again, I didn’t capitalize on the excitement I got from my career counselor and now the feeling is lost.
Under the Sea: class project; like the design and am happier with the colors. I had an idea for it, which didn’t end up working out. I would like to finish it soon.
Black and Red quilt – This came about because of two other projects. I made a whole bunch of bias tape as part of my failed attempt at doing the Mighty Lucky Club a few years ago. Another part of the inspiration came from my class with Tina of Little Blue Cottage fame. This was going to be for a nephew, but I think it will be for one of my SILs and BILs. I have rectangles cut and some bias tape ready. My next step is to sew the bias tape to the rectangles like pickup sticks. I don’t have any photos of this, so you’ll have to trust me.
Half Rectangle donation quilt – I want to work with half rectangles and the 16 patches we make for the guild. I have the blocks made and the cool ruler I thought would work for this project. Now I need to gather the fabric and just do it.
Small Projects in Process
2 gift Sew Together Bags- most of the fabric is cut , the zippers are purchased and I am ready to sew
Another Sew Together Bag for me – the fabric is cut, the zippers are purchased and I am ready to sew
1 gift Sew Together Bag as a gift – nothing cut
Mel Beach quilted piece – I want to make it into a pillow cover
Tool Tote – I bought the pattern at QuiltCon and started cutting it out at Sew Day in March
Ready for Quilting
nothing right now
In Quilting Process
En Provence – at Colleen’s. She hasn’t quilted it yet, because we can find the right color thread for the blue.
Theoretically, the Tarts Come to Tea is in the quilting process, though I haven’t worked on it in a while. See above.
Triple Star – Finished piecing and is at the quilter
Binding
Ta Dots & Stripes Quilt (was called last time Dots & Stripes HST Quilt (or Something) ) – Finished quilting and is ready to be bound
Planned Improv – Finished quilting and is in the binding process
Hunting and Gathering
30 Something: I am still cutting 1.5 inch squares. I am pretty sure I have the 800 I need, but I am not ready to sew them together yet, so whenever I have a chance I cut more I cut more. It will give me choice when the time comes. I’ll have to think up a new name, too. My next step will be to figure out if I need to cut other sizes of squares and switch from cutting 1.5? squares to cutting the new size.
Blue Gradation Quilt: cutting 2.5 inch x 4.5 inch blue rectangles. It has to end sometime. I wasn’t sure I was ready to put this together, but I think I am. I might do a couple of gradation quilts in a row just to get the practice.
Blue Lemonade: cutting blue, green, purple 2 inch squares. I used a lot of these squares for En Provence, so I am slowly cutting more.
Pink Gradation Quilt: cutting 2.5 inch x 4.5 inch pink rectangles
Spin Wheel: really not started, but supplies gathered. I might have to cut some more background fabrics. I probably have enough fabrics and just need to decide to start.
Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background, which required the purchase of a new template. I should be able to get going again
Other
Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space (and desire) in my schedule.
I’ve used just under 30.5 yards of fabric so far this year. I am pleased, but I want to hit 50 soon and possibly make it to 100 NET, not gross.
I have been cutting a lot of fabrics for this quilt. As a result, I was reminded of why I like Hunting and Gathering. I have not hunted or gathered fabrics for this project, so I have to cut fabric in order to finish. If I had done some Hunting and Gathering, I would have all of the cutting completed and be on to piecing. I don’t really like cutting a lot all at once. For a scrappy quilt, there is a lot of cutting.
Stepping Stones n.2- end of Feb 2018
Fortunately, I just got to it, listened to a book and cut away. Since the beast is so big, i can only really work on two sides at a time. In the photo, right, I am working on the top and the right hand side. While only working on two sides, I am still cutting for the left and bottom. Compared to the photo I showed you last week, you can see that this piece is progressing well. You can also see the design coming together.
I finally cut enough fabric so that I could put a couple of blocks together. I just had to do it. I felt like I was making no progress, even though I could see that I was cutting. So, I made the blocks. What a relief. Now I feel like I am making progress. It is just tedious to keep cutting, cutting, cutting all the time.
Stepping Stones: right hand top corner
The block with the green and blue HSTs is one of the corner blocks. With the red 4 patch, you can see how the border integrates into the quilt design as a whole.
Stepping Stones: inner border block
Stepping Stones: corner border block
As mentioned I was able to piece two blocks. You can see the red four patches and the rest of the blocks in more detail above. While there are some duplicates, most of the border blocks are made especially for one location in the quilt. I designed the border this way, so the center motif would be finished and not cut off along the edges.
After FOTY 2016, I put the Stepping Stones n.2 on the wall. I thought of doing the Blue Gradation quilt, but I needed something relatively easy.
HA! I chose wrong. This quilt isn’t difficult and all the center blocks are finished. I need to make all the border blocks and in the design of the border, I am using the self bordering technique. This means that the border is made from blocks that, when viewed together, form a border.
I had completely designed the border, which was good and just needed to make it. I found that I had no green patches, no blue 4.5″ patches and no HSTs. Basically I had to made the whole border from scratch – cutting everything, making the blocks and finally sewing.
No problem, right?
Well, it was a little bit of a problem, because the quilt is too big for my design wall. Sigh. I have to make part of the quilt and then move the quilt over and make the rest. It is a strategy, but not an ideal strategy.
I have about two complete border blocks done, mostly because I needed to see some progress. The style of the quilt requires a lot of different fabrics, so a lot of cutting.
I finished the Triple Star top and back. The package is ready to go to the quilter, which will, once I get it there, make 4 quilts she will have of mine. I am waiting to finish another top before I take this one to her.
I used Sarah Goer’s Planned Improv technique to lay the quilt out, as I mentioned. It worked well, though I would have made some adjustments if I had a larger design wall. Some of the stars needed a bit more space. I just didn’t have the room I really needed to work.
Still, I am pretty pleased with the way it came out and am on to the next project(s). 🙂
As I said in January, I am working on getting my quilt house in order. This means finishing projects and tidying. I spent a lot of time last week doing a minor reorganization of my fabric closet. I bought a couple of project bins that will corral some of the stacks of fabric I am fighting with. I also made progress on some projects, which is the whole point of this exercise.
Terrain quilt – SIL and I made the top and back and Tim quilted it.
Mostly Manor HST top and back – ready for quilting by Tim
In Process
The ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.
City Sampler – blocks all made. Need to sash the blocks and put the top together. Due to some issues I had with my seam allowance, some of the blocks are smaller than others, so I will have to adjust them in some way – either ripping and resewing, adding a piece or two to the block or with sashing. This is sort of a sticking point and while I consider this quilt ‘in process’ I hadn’t worked on it in awhile until I took the blocks to the BAM Sew Day and started measuring. Once I know what I am facing for each block, I can move forward.
English Paper Piecing Project– half hexies – I have mostly been knitting while I watch TV, but I did make some half hexies in anticipation of making another star.
FOTY 2016 – Squares are up on the design wall and being arranged.
FOTY 2017 – pieces cut. Need to layout and start piecing.
Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.
Aqua-Red Sampler – I need to lay the blocks out and put the piece together.
BAMaQG IRR – I will either quilt it and donate it to charity or use it for the Big Stitch class I am taking at QuiltCon.
Handbag Sampler – this is a project about which I had forgotten. I haven’t even found a picture of all the blocks. The blocks were teaching samples when I taught a sampler class the time before I started writing the quilt class sampler tutorials. I actually don’t know exactly where the blocks are, but I have an idea and will crawl up in the far reaches of my fabric closet soon and find them.
Lobster – I still have more stitching to do and then I need to quilt it.
Octagon 9 Patch: In the past week or so, I have started to sew pairs together as leaders and enders. I am not convinced this is a great idea, but I want to make progress, so I will make it work.
Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. No progress.
Pies and Points from Victoria Findlay Wolfe class. No further progress. I need to focus on this and it is not up high enough on the list yet.
Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I am stalled on this again. Again, I didn’t capitalize on the excitement I got from my career counselor and now the feeling is lost.
Stepping Stones #2 – I checked the design and have the border block designs complete. I will have to inventory what units I have that will be needed to make up the border blocks before I am ready to sew.
Under the Sea: class project; like the design and am happier with the colors. I had an idea for it, which didn’t end up working out. I would like to finish it soon.
Black and Red quilt – This came about because of two other projects. I made a whole bunch of bias tape as part of my failed attempt at doing the Mighty Lucky Club a few years ago. Another part of the inspiration came from my class with Tina of Little Blue Cottage fame. This was going to be for a nephew, but I think it will be for one of my SILs and BILs. I have rectangles cut and some bias tape ready. My next step is to sew the bias tape to the rectangles like pickup sticks. I don’t have any photos of this, so you’ll have to trust me.
Half Rectangle donation quilt – I want to work with half rectangles and the 16 patches we make for the guild. I have the blocks made and the cool ruler I thought would work for this project. Now I need to gather the fabric and just do it.
Small Projects in Process
Hansel and Gretel dolls and accessories for my little niece. The quilt is done and all the other pieces are ready to be stuffed.
EPP Travel pouch gift – Main pieces are all cut and I am sewing various bits together.
2 gift Sew Together Bags- most of the fabric is cut and the zippers are purchased
Another Sew Together Bag for me – most of the fabric is cut and the zippers are purchased
1 gift Sew Together Bag – nothing cut
Mel Beach quilted piece – I want to make it into a pillow cover
Theoretically, the Tarts Come to Tea is in the quilting process, though I haven’t worked on it in a while. See above.
Binding
Nothing at the moment
Hunting and Gathering
30 Something: I am still cutting 1.5 inch squares. I am pretty sure I have the 800 I need, but I am not ready to sew them together yet, so whenever I have a chance I cut more I cut more. It will give me choice when the time comes. I’ll have to think up a new name, too. My next step will be to figure out if I need to cut other sizes of squares and switch from cutting 1.5″ squares to cutting the new size.
Blue Gradation Quilt: cutting 2.5 inch x 4.5 inch blue rectangles. It has to end sometime. I wasn’t sure I was ready to put this together, but I think I am. I might do a couple of gradation quilts in a row just to get the practice.
Blue Lemonade: cutting blue, green, purple 2 inch squares. I used a lot of these squares for En Provence, so I am slowly cutting more.
Pink Gradation Quilt: cutting 2.5 inch x 4.5 inch pink rectangles
Spin Wheel: really not started, but supplies gathered. I might have to cut some more background fabrics. I probably have enough fabrics and just need to decide to start.
Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background, which required the purchase of a new template. I should be able to get going again
Other
Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space (and desire) in my schedule.
I’ve used just under 19 yards of fabric so far this year. Not shabby.
This is a very preliminary layout for the Triple Star. I had planned to use Kim Brackett’s straight layout from the book, Scrap Basket Beauties, but the thought of that type of layout just became too boring for me*.
I decided to use Sarah Goer’s Planned Improv method to layout these blocks. I thought it would work with a quilt in addition to just blocks. I got out some graph paper, taped it together and began drawing in the blocks.
Unlike the blocks for my Planned Improv Quilt, there will be spaces in between the blocks. I am also not starting in the middle and working out, which complicates the design. I had no trouble drawing out the design, but I think this quilt will be primarily made up of partial seams. Partial seams are not hard and some people equate them to Y seams (also not hard, check my tutorial), but they are really different. I have a tutorial on partial seams if you don’t know how to do them.
Stay tuned.
*I am not implying that the layout Kim Brackett shows is bad in anyway. I just didn’t want to lay my blocks out that way.
I decided on a layout for the Triple Star quilt and needed one more block to make it look mostly balanced.
I made it mostly from the leftovers that I didn’t use in the other blocks. This makes it heavily made from warm colors. I decided not to worry about it as it wouldn’t stand out with all of the other blocks.
The Ta Dots and Stripes quilt top and back are finished and with Colleen ready for quilting.
As I said, this was going to be a donation quilt. It turned out to be much more appealing, though still an eye bender, than I thought so it will go to one of the nephews.
It is on the small size – about 45×60. I wanted a border to contain the chaos and make it a little bigger. I tried some fabric, but my IG peanut gallery nixed the idea and I had to agree. I couldn’t find a fabric print that worked and a solid was be too flat.
Ta Dots & Stripes Top – trying out borders
I tried a grey dot, which was ok, but not great. I like the fabric, but it just didn’t work with the activity of the quilt. So, no border.