En Provence Almost the end

I made a lot of progress on the En Provence quilt and it is nearing the conclusion.

En Provence -December 2017
En Provence -December 2017

I started out Saturday afternoon sewing the two halves of the top together. Then I laid out the quilt to see where I was. It was really great to see almost the whole quilt laid out. I think it looks really great.

After seeing the quilt so close to completion, I was on fire to sew the last 4 rows. I took everything back upstairs and laid on that bottom corner on my design wall.  I didn’t have much more time to do that on Saturday and no time to sew.

En Provence Beginning - Dec. 3, 2017
En Provence Beginning – Dec. 3, 2017

Laying out the last corner was huge, though. I found I was missing a couple of Peaky & Spike blocks, so I had to cut some fabric to finish those. It was good, though, because I could switch out some of the Peaky & Spike blocks that I hadn’t yet sewn.

After we came back from a NSGW event on Sunday afternoon, I put the pedal to the metal on my sewing machine and sewed 3 rows. I know there are only 3 blocks left in each row, but there is still a lot of piecing. I also have to add the border and that makes some of the blocks larger, thus more time consuming to sew.

En Provence - 3 good rows
En Provence – 3 good rows

I ended up with what I thought was 3 good rows.

Standing back really helps and I found a mistake. I stopped after the mistake block. It was really too late for me to be sewing anyway and I’d already had to rip out two sections of that block.

En Provence Ooops
En Provence Ooops

Except for the two pieces, I am pleased with how this quilt came out. It is not insane like Grand Illusion, but it was complex enough to keep me interested and interesting enough to want to continue to look at it.

I’ll fix it next time….whenever that is.

26 Projects – December 2017 Edition

All of those year end lists will soon be out, including my year-end summing up. It’s been a few months since I did an inventory of my works in progress, so I thought this was a good time.

Finished 2017 Quilt Projects

Finished 2017 Non-Quilt Projects
While finished quilts are still a bit thin on the ground, I have been sewing. I have finished a lot of small projects, I am working on quilts and I have one more quilt finished this year than I did last time.

This year so far I have used 157 yards of fabric making the above along with donation blocks and tops. I am finally in the black in terms of usage.

Doing Good

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.

  • City Sampler – blocks all made. Need to sash the blocks and finish putting the top together. Due to some issues I had with my seam allowance, some of the blocks are smaller than others, so I will have to adjust them in some way – either adding a piece or two to the block or with sashing. This is sort of a sticking point and while I consider this quilt ‘in process’ I haven’t worked on it.
  • Dots & Stripes HST Quilt (or Something) – half square triangle blocks are made. I laid them out and see what is what with them. These blocks did not turn out as planned. I will put them together and donate the top to Charity.
  • English Paper Piecing Project– half hexies – I haven’t worked on this in awhile since I have been knitting while I watch TV. I’ll get back to it.
  • En Provence – I have three quarters of the quilt put together and am nearing the end.
  • FOTY 2016 – I didn’t capitalize on my excitement after seeing the Ellsworth Kelly exhibit and now I have lost that rush. I still need to get on it. I’d like to get the top finished by the end of the year, if nothing els.
  • Lobster – I still have more stitching to do and then I need to quilt it.
  • Triple Star: The blocks are all made and I have an idea of how to lay it out.
  • Under the Sea: class project; like the design and am happier with the colors. I had an idea for it and would like to finish it by the end of the year.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

  1. Aqua-Red Sampler – I need to lay the blocks out and put the piece together.
  2. BAMaQG IRR – I have decided to quilt it and donate it to charity.
  3. BAMaQG Color Round Robin – no progress.
  4. Octagon 9 Patch: It is ready to put together. I could have used it as leaders and enders for a number of different projects I have going. I didn’t, mostly because I have a lot I can use as leaders and enders. Not sure what I am waiting for. Do I want to lay out the blocks more carefully? I actually have a plan for it, so I should get on it. I should do a lot of things.
  5. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, I did bring it to the 2017 CQFA Retreat as a potential project. It is still in a prominent location so I have easy access. I plan to bring it to the BAMaQG retreat.
  6. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. No progress.
  7. Pies and Points from Victoria Findlay Wolfe class. No further progress. I did wash the background fabric I found when I went to Portland, so I am ready to cut. I need to focus on this and it is not up high enough on the list yet.
  8. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I am stalled on this again. Again, I didn’t capitalize on the excitement I got from my career counselor and now the feeling is lost.
  9. Serendipity Lady Quilt: no progress.
  10. Stepping Stones #2 – I am still ready to make the border blocks , but haven’t gone beyond designing them yet.
  11. Stripes & Dots HST quilt – need to sew blocks together.

Ready for Quilting

  • Nothing at the moment

In Quilting Process

  • Mostly Manor Lozenge quilt – Colleen is quilting it and I sent her the bindinga  few days ago.
  • Thanksgiving tablemat – I started quilting this piece at the 2017 CQFA Retreat. I made good progress, but it isn’t finished yet. It will be another BAMaQG retreat project.
  • Theoretically, the Tarts Come to Tea is in the quilting process, though I haven’t worked on it in a while.  See above.

Binding

Nothing at the moment

Hunting and Gathering

  • 30 Something: I am still cutting 1.5 inch squares. I am pretty sure I have the 800 I need, but I am not ready to sew them together yet, so whenever I have a chance I cut more. It will give me choice when the time comes. I’ll have to think up a new name, too.
  • Blue Gradation Quilt: cutting 2.5 inch x 4.5 inch blue rectangles. It has to end sometime. I am just not sure I am ready.
  • Blue Lemonade: cutting blue, green, purple 2 inch squares. I used a lot of these squares for En Provence, so I will need to cut more.
  • Pink Gradation Quilt: cutting 2.5 inch x 4.5 inch pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. I bought a new template, so I should be able to get going again

Other

  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space (and desire) in my schedule.

What’s on your list?

Final Weekend En Provence Progress

En Provence upper right hand quarter - November 26, 2017
En Provence upper right hand quarter – November 26, 2017

I added “Piecing” to the hashtags for this post. Immediately my mind revised that as ‘interminable piecing’. I don’t really feel tired of this project, but there are a LOT of seams and I am ready for this top to be finished. Good thing I made significant progress over the weekend.

The upper right hand corner is finished and this means that I have 4 rows of 3 blocks to finish. If I had 4 days free, I could finish the top by the weekend.

I have been sewing the border on as I go along. Using the ‘self-bordering’ technique makes the border much more precise in terms of matching seams. You also don’t have long seams to sew (and match) or borders to add once the center is done. I use this technique as much as possible. It makes my life so much better.

Thanksgiving Weekend En Provence Progress

We had 24 people over for Thanksgiving, so there was no sewing Monday through Thursday while Thanksgiving prep was taking place. I was also working.  I did, however, make some good progress over the weekend.

En Provence, November 24, 2017
En Provence, November 24, 2017

I spent most of the day on Friday sewing. I even declined to watch a movie with the boys in order to sew. They needed some alone time anyway. More than half of En Provence is pieced and I am working on the upper right corner.

I got up and set about sewing pretty soon after that. I usually go for a walk before I sew to get it out of the way, but needed more resting time before I did that. The first thing I worked on was finishing the last/top row of the left hand side.

After coming back from my walk, I laid out the upper right hand side and started piecing. I was able to finish sewing a row and a half of that quarter. I would love to finish this weekend, but doubt that will happen. Bonnie Hunter’s Mystery Quilts require a lot of piecing, which is what makes them such great scrap quilts. Still, I have to sew a lot of short seams and there are a lot more to sew.

More En Provence

En Provence, November 19, 2017
En Provence, November 19, 2017

I started out late on Sunday with the piece above. I had finished chopping about a million ingredients for various Thanksgiving dishes and was delighted to find that I had some time to sew.

I had sewn most of the last row together, but had a few more seams, so I put those together and found, suddenly that I was able to layout the last row on the left half of this top. Shocking! I thought I had miles together.

I really don’t know why I keep being surprised by this quilt – how much I have sewn, how much I have left, how well it looks. Perhaps I should call it En Provence Surprise?

En Provence, November 21, 2017
En Provence, November 21, 2017

I had to fold down the piece before I could layout the top row. I could have reached, but why? It would have been a stretch every time I sewed two pieces together or checked the pressing. I wasn’t up for it.

It is extremely gratifying to see the top row even if it is just laid out and not sewn yet.

Triple Star is at a stopping point until I lay it out and decide on a final design, so I used donation blocks as leaders and enders. I finished 2.5, which isn’t shabby.

I know it is all En Provence All the Time on the blog these days. It is what I am working on except for gifts, which I am not working on enough and can’t show at the moment any way. You’ll have to bear with me for the time being.

Sticking It All Together

I counted up blocks and rows and units again and found that I am farther along than I thought. It all started when I noticed that I was getting very short of the quarter triangle units. I carefully counted and found that I only have to piece two more rows on the top to finish one whole half of the quilt.

Or so I thought.

Really, I have to piece two blocks top to bottom for the right side. I was shocked that I had so little left to do. I had been sure that I had an equal number of blocks to piece for the right side as I had on the left. I don’t know how I got so turned around, but this is great news! I thought I would never finish piecing this quilt. Yet, I had already done so much.

As a treat, I decided to see how the piece would look once it was stuck together. Sort of.

Merged En Provence Left Half
Merged En Provence Left Half

I put two images together. There are slight differences in lighting, and the bottom is folded up, but you still get the idea. I am thrilled.

I saw another version of the pattern on Instagram. It is by Sylvia, Sommerschiebe. I love how round this circles ended up.

Triple Star Blocks Finished

I had an unexpected day of sewing on Sunday. Mom and I were scheduled to visit her quilt show, but she was called on to act in her Presidential Duties at her church. I was sad not to see her, thought glad to avoid the 2+ hour each way drive. My long commute has prevented us from getting together regularly and that is hard. Mom and were able to catch up for a few minutes on the phone and that was nice.

I sewed instead. I sewed A LOT.

One of the projects on which I made progress was the Triple Star blocks. I have made all the blocks called for in the pattern. After taking Sarah’s class on Saturday, I have a different idea of the layout and may need to make more to get the right balance.

The pattern calls for a straight set – 4 down, 4 across. After Sarah’s class, and after thinking about the layout of the Stars #3 Donation quilt, I want to do something different, more interesting.

Triple Star Potential Layout
Triple Star Potential Layout

I did a quick layout with three quarters of the blocks, which resolved my uncertainty. I like the asymmetrical idea, though I realize that I may need a few more blocks for the upper left and lower right hand corners.

Even if this particular layout (definitely without the toes) will not be the final layout, I am on the right track. Using Sarah’s technique, I be able to cut exactly what I need to put it together.

En Provence – More Progress

En Provence - Start of upper left quarter
En Provence – Start of upper left quarter

I made a little progress over last weekend, after fixing my Oops. I was able to take down the bottom quarter of the quilt top and put up the pieces for the top left quarter. In addition to the three rows you see in the image, I have two more rows to sew to complete half the quilt.

I know I am getting ahead of myself, but I am excited to see the progress of this quilt. It is really a lot of piecing. The result is fantastic, from what I can see so far, but it is taking a long time to piece.

The half rows I am piecing have 75 units to sew together to get the 6 block half row. I say units because I have already pieced the units together. Each blue star has 32 pieces and each pink star (not the border blocks) has 24 pieces. I am glad the units are all pieced, I have to say.

Triple Stars Return

I was hung up on the Triple Star project because I needed to cut a few more pieces. I couldn’t seem to get to it. It seemed like a good thing to do over the weekend while I was home fighting off a cold. Wielding a rotary cutter isn’t always a good idea when taking cold medication, but in this case, all the cold relief was minor.

I got the pieces cut and was back in business making Triple Stars in between putting En Provence together.

I finished n.12, which had been in process for a few weeks. I was also able to finish a second.

I am finally making progress on this project again. Three more blocks and I can put the quilt together.

 

Another Triple Star

I really feel it keenly when I can’t sew, so I think I am posting every little bit of progress so I don’t seem like a slacker in my own mind.

Triple Star #11
Triple Star #11

This is the most recent star that I have made.

Due to some cutting errors I repurposed some of the pieces to other uses in the Triple Star. This means I have to cut more before I can make much more progress on the rest of the stars. I have one in progress and am sewing as much of it as I can, but I have to cut.

As much as the flippy corners method is a pain, I do like the look of the Friendship Star in the center.

Four and a half more blocks to go.

Design Wall Monday

Design Wall 10/16/2017
Design Wall 10/16/2017

I have been writing about En Provence and the Triple Stars a lot. They are the main projects, though I slip in other sewing here and there.

My design wall doesn’t have a lot on it at present, though I thought it would be interesting to show you how I work with a smaller design wall and a larger quilt.

Off hand I don’t know how large En Provence will be. I am doing the large version, so I am sure those of you who have made it know. I am not, usually focused on sizes. Regardless of the final size, it won’t fit on my design wall after a few more rows and columns.

Design Wall, October 15, 2017, annotated
Design Wall, October 15, 2017, annotated

1 – En Provence. I am working from the left bottom corner up towards the right top corner. This is the usual way I put a quilt together, because then I can be sure that, at least, the bottom will be on the design wall.

2 – En Provence fold. I fold the quilt and cover part of the quilt I don’t need to see right at the moment. Since I am working on adding a column on the right, the middle part isn’t needed, except for reference right now. (You might have to enlarge the photo to see the fold.

3 – Triple Star. This is my reference block.

4 – Triple Star. This is my current block in progress, n.12.

The last design wall Monday was back in March. Take a look at that post to see my progress. I am linking up with Patchwork Times, uh Small Quilts and Doll Quilts, the new hosting site of Design Wall Monday. Since I haven’t posted a Design Wall Monday in awhile, this is the first I have heard of this.

3 Triple Stars

In between working on putting together the En Provence quilt, I have been sewing Triple Star blocks together. I use the blocks as leaders and enders.

While I am concerned that using the blocks as leaders and enders means I am not as engaged with the quilt, I really have to have something in between the En Provence pieces to keep them in order. While I could make make more donation blocks, I want to make progress on other projects as well, so the Triple Star blocks are the leaders and enders.

Unlike Fresh Fruit, I have to pick a lot of colors for the blocks. I also have a lot more seams to sew, so I do pay attention.

What Else We Did at the BAMaQG Retreat

BAM 2017 Scrap Attack
BAM 2017 Scrap Attack

I wasn’t the only one busy at Retreat. A lot of charity blocks and tops were made. People also worked on their own projects.

MassDrop gave the guild a bunch of fat quarter packs to use to make charity quilts. The group did not disappoint. Right there, at least 5 were made. There were only about 4 packs left at the end of the day on Sunday, so I think others are in process.

Yellow Donation Quilt
Yellow Donation Quilt

Gerre had taken my Yellow Donation quilt and quilted it. She was working on the binding on Friday at the Retreat. She finished it and, thus, finished the quilt at the Retreat. I was pleased that she had worked on the top I made. I always feel happy when Gerre and I collaborate, especially when she says nice things about my color combinations. 😉

Michelle S' map quilt
Michelle S’ map quilt

Michelle S was working on, what I think of as, a map quilt. She had a different name for it, but I thought the blocks looks like a map or aerial photo.

Retreat 2017 Workspace
Retreat 2017 Workspace

I didn’t take as many photos as I expected to. I was focused on sewing and getting as much done as possible. There was a lot of moving around to shared cutting tables and ironing stations. People were also very chatty and interested in what other people were working on. It is always interesting to be in a Retreat situation because you get to see how other people work, what they are working on and how they interact with other.

BAMaQG Retreat

I have discussed the Retreat in passing over and over, so finally decided that I should get around to writing about the retreat itself.

BAM 2017 Scrap Attack
BAM 2017 Scrap Attack

The Retreat started on Friday at 10am. Following along with our year long theme, Scrap Attack, the Retreat followed that them as well.

Before arriving at the Retreat, I went to the gym, ate breakfast and packed the car. I had two days at home alone (YM gone at school, DH on a NSGW trip) in the evenings during which I prepared and packed and organized. After leaving to go to the Retreat, we stopped at Always Quilting and The Granary. I wanted to find an open toe Acufeed foot for my Janome 6600. I planned to quilt the Thanksgiving tablemat and needed to see where I was going. The Acufeed foot that came with the machine is good, but not for seeing exactly where the foot is going or following a line. I didn’t get my hopes up for the foot to be available at Always Quilting and I wasn’t disappointed. I resolved to try to quilt the tablemat anyway.

We went to the Granary, because I like that store and SIL had never been there. I bought a couple of pieces of fabric, thinking I might make an extra Cell Phone Wallet with one of the pinks.

Sewing Nirvana?
Sewing Nirvana?

Then we headed the 8 or so blocks to the Wild Palms hotel and to sewing nirvana. We didn’t arrive until about noon, but we set up and got to work right away. Nirvana isn’t easy and setting up took some time.

Once I got set up, my first order of business was sewing together all seven Cell Phone Wallets I had cut out.

Lesson one for quilting retreat is prep your projects. Having several projects already cut out made my output much better than expected.

7 Cell Phone Wallets
7 Cell Phone Wallets

I had cut out seven Cell Phone Wallets from fabric leftover from dresses and tunics. I spent Friday making them. I didn’t think I would get as far as I did, but I was able to finish all except for weaving in the last two ends from top stitching. I was shocked that I even had time to turn the pieces. Turning these and poking out the ‘corners’ is not for the faint of heart. I rose to the challenge and got the job done. Now I am going to feel a lot more confident when wearing my dresses, skirts and tunics. I made all of these with D rings and will use the same chain for all of them. I also think I can use the black one with other black outfits.

Thanksgiving Table Mat
Thanksgiving Table Mat

Next, I started quilting the tablemat. 🙁 It didn’t work. I want to follow the lines of the leaves and other Thanksgiving motifs and I just couldn’t see where I was going. I ripped stitching out three times before I gave up. I would really like to get it done before Thanksgiving. Not only to I want to count the yardage as fabric used, I also want to have one less item on my to do list. I have ordered new feet from Sew Vac Direct, a suggestion from Gerre, so we will see.

Poolside Tote
Poolside Tote

No rest for the sad or wicked. I was determined to get as much done as possible. So, next up was the Poolside Tote. Not only had it been taking up horizontal surface space for a long time – ever since I cut it out at Scruffy Quilts back in May, but Tim and I had decided to work on ours together. Julie said she would make one as well, but she wasn’t at the retreat and I have only seen quilts coming out of her studio. You can read about the sewing, etc of this tote in the post from earlier in the week. I am not sure if I will make this tote again. I may need to as it is large and popular.

Mostly Manor Lozenge Quilt
Mostly Manor Lozenge Quilt

I worked on this all day Saturday and a little bit on Sunday morning. Next on the list was the Mostly Manor Lozenge quilt. I had the blocks made so all I had to do was sew them together. Lucky for me, the raffle prizes had all been given away (I won a charm pack of grey Northcott solids-YAY), so I had a table right behind me to use as design surface space.

I sewed fast and got this top done in a couple of hours. I used the Terrain donation blocks as leaders and enders.

In between everything I made three donation blocks. We received kits for 3 donation blocks in our goody bags. I didn’t have a lot of leaders and enders opportunities, so I rushed at the end to get these done. The Committee gave extra raffle tickets for handing in donation blocks and charity quilts and tops.

I really didn’t want to leave and stayed until the bitter end. The Retreat Committee did a great job organizing everything and I was thrilled to get so much done.

26 Projects – October 2017 Edition

Finished 2017 Quilt Projects

Finished 2017 Non-Quilt Projects
While finished quilts are thin on the ground, as you know, I have been sewing and I have finished a lot of small projects. I am working on quilts and t I plan to make more small projects this year.

Shockingly, the above along with donation blocks and tops is about 70 yards of fabric this year and I am not in the black in terms of usage.

Doing Good

In Process
The  ‘In Process’ is used to denote projects on which I am actively working or pretending to stitch. I try not to put away projects, because that will ensure I never work on them.

  • City Sampler – blocks all made. Need to sash the blocks and finish putting the top together. Due to some issues I had with my seam allowance, some of the blocks are smaller than others, so I will have to adjust them in some way – either adding a piece or two to the block or with sashing. I did actually put the sashing and the blocks in my bag for Sew Day yesterday. I just didn’t get to working on them. I need to press the VERY large piece of backing fabric and it was just too hot.
  • Dots & Stripes HST Quilt (or Something) – half square triangle blocks are made. I laid them out and see what is what with them.
  • English Paper Piecing Project– half hexies – I am still making stars. I am still using the big stack of fabrics I cut over Thanksgiving to make them, though I am starting to run out and I will need to cut more. I am filling in the weird shape I talked about last time. Next up, adding a border to one side to keep me from making it a weird shape again. I need to find the triangle papers and the fabric I planned to use.
  • En Provence – I finished the the fifth and sixth clues. I am on Clue 7, which is starting assembly, but I still have some blocks to make. I am using HSTs instead of plain blocks to make the quilt flow better. For the same reason, I am making more Peaky and Spikes and using them instead of QSTs. I have some more work to do.
  • FOTY 2016 – I didn’t capitalize on my excitement after seeing the Ellsworth Kelly exhibit and now I have lost that rush. I still need to get on it. 9 months into the year and I am still not done. 🙁
  • Lobster – I still have more stitching to do and then I need to quilt it.
  • Triple Star: I am sewing the pieces into blocks as leaders and enders between  other projects.
  • Under the Sea: class project; like the design and am happier with the colors. I had an idea for it, but got another idea last week at Craft Night that might be better.

Still WIPs
I still have WIPs. Who doesn’t, after all? A project in the ‘UFO’ category means I am stalled. A nicer way of saying UFO is a WIP. The list is a lot shorter and the projects are newer, for the most part.

  1. Aqua-Red Sampler – I need to lay the blocks out and put the piece together.
  2. BAMaQG IRR – this was never on the list before, but I have clearly been working on it for a long time. I think the last time I even really thought about it was in June of 2016 when Ruth returned it to me. The last post has some good ideas about what I need to do next.
  3. BAMaQG Color Round Robin – this was just returned to me and I think I will just finish it and send it off to a friend who has a 1 year old.
  4. Octagon 9 Patch: It is ready to put together. I could have used it as leaders and enders for a number of different projects I have going. I didn’t, mostly because I have a lot I can use as leaders and enders. Not sure what I am waiting for. Do I want to lay out the blocks more carefully? I actually have a plan for it, so I should get on it. I should do a lot of things.
  5. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, I did bring it to the 2017 CQFA Retreat as a potential project. It is still in a prominent location so I have easy access. I plan to bring it to the BAMaQG retreat.
  6. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. No progress.
  7. Pies and Points from Victoria Findlay Wolfe class. No further progress. I did wash the background fabric I found when I went to Portland, so I am ready to cut. I need to focus on this and it is not up high enough on the list yet.
  8. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I am stalled on this again. Again, I didn’t capitalize on the excitement I got from my career counselor and now the feeling is lost.
  9. Serendipity Lady Quilt: no progress.
  10. Stepping Stones #2 – I am still ready to make the border blocks , but haven’t gone beyond designing them yet.
  11. Lozenge quilt – Blocks are trimmed. Need to sew them together.
  12. Stripes & Dots HST quilt – need to sew blocks together.

Ready for Quilting

  • Nothing at the moment

In Quilting Process

  • Carpenter’s Wheel is being quilted– I took this to Colleen’s a few weeks ago and am waiting for her to get back to me.
  • Thanksgiving tablemat – I started quilting this piece at the 2017 CQFA Retreat. I made good progress, but it isn’t finished yet. It will be another BAMaQG retreat project.
  • Theoretically, the Tarts Come to Tea is in the quilting process, though I haven’t worked on it in a while.  See above.

Binding

Nothing at the moment

Hunting and Gathering

  • 30 Something: I am still cutting 1.5 inch squares. I am pretty sure I have the 800 I need, but I am not ready to sew these yet, so whenever I have a chance I cut more. It will give me choice when the time comes. I’ll have to think up a new name, too.
  • Blue Gradation Quilt: cutting 2.5 inch x 4.5 inch blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2 inch squares. I used a lot of these squares for En Provence, so I will need to cut more.
  • Pink Gradation Quilt: cutting 2.5 inch x 4.5 inch pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I am supposed to be cutting a variety of greys for the background. I bought a new template, so I should be able to get going again

Other

  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I have all the fabric in pre-cuts and am just waiting for space (and desire) in my schedule.

What’s on your list?