
As mentioned the other day, I had cut only enough pieces for one (of three!) Month 16 rosettes. The M16 process is taking me forever. I cut and basted at Sew Day, but I guess I didn’t make as much progress as I thought. I was cranky and irritable that day.
Or it feels like it is. The other day, I left work at 4 and started cutting and basting.

I used the same fussy cutting layout for the pink rosette as I did for the blue part of Rosette #1. I like how the blue one looks and hope the pink one will look similar.
I also didn’t use the snake heads for the green rosette. I used the fabric, but cut the flowers out of it and avoided the snakes. Apparently, insects are ok, but snakes are categorized with animal heads in my quiltmaking mind.
I also rearranged the colors quite a bit. One of the remaining M16 rosettes will have more spikes.