DWM – Mid November

I spent most of the day yesterday out with Kelly and making banana bread. The Young Man budgeted for $40 worth of bananas for his Eagle Project and then BOUGHT THEM!!! People ate bananas, but $40 is a lot of bananas and we had a about 20 left after the project. By yesterday 12 were left, which meant 3 double batches of banana bread. I spent about 3.5 hours in the kitchen, including a walking trip to Trader Joe’s because I ran out of eggs. I got some steps in, but used up a lot of sewing time on this ‘project.’

Design Wall November 17, 2014
Design Wall November 17, 2014

Thus, the design wall looks pretty similar to last week’s version. I have high hopes that the end is nearing on a few projects, but time will tell, especially with holidays coming up.

1. More of the red 2″ squares for my 4 patches. I really need to cut some 2″ turquoise squares. I just can’t seem to get to it.

2. Black & Grey Teenaged Boy Donation Quilt blocks. I finally finished that last block that had been languishing, for, what seemed like, weeks. Next step is to layout all the blocks and look at them. I need to decide whether to sew them together with sashing or not. I hear red fabrics crying out for my attention when I think about this quilt.

3. Pieces and part of the PIQF Cross blocks. I have the other background parts cut as well; they are just somewhere else waiting for me to have a moment to decide on the fabric for the on point squares.

4. Start of a donation block for BAMQG. Made with leaders and enders technique yesterday as I sewed another side of a Russian Rubix border together.

5. My PIQF Cross blocks, some only partially sewn.

5.5 This is the PIQF Cross block that TFQ made. Somehow it got separated from its friends, though, perhaps, it volunteered to play referee between the red 2″ patches from and the Teenaged Boy Donation Quilt. 😉

6. Russian Rubix Octagons. I am still making a few blocks for the border. I am not sure if I will use these in the Russian Rubix quilt or if they will be part of the Snowball/9 Patch quilt I have in mind. If I do that piece it will be the third quilt I make from that collection of fabrics. It is interesting to do that. Perhaps I can consider it a series?

7. Most recent FOTY rectangles. These are the last of the fabrics that TFQ pressed for me. I need to toss another load of new fabric into the wash and continue on.

 

I am linking up with Judy over at the Patchwork Times. Looking through a few of the other links is fun. I see projects and things that I wouldn’t have otherwise seen.

Design Wall Monday

Design Wall Monday 11/10/2014
Design Wall Monday 11/10/2014

It seems a little odd to keep posting these photos of what looks like the same design wall week after week. Still there is some difference. You can see the blocks I am making for the project TFQ and I are working on.

The octagons are still there, because I am still stuck on the Russian Rubix border. I got a little push in the right direction, but I just I haven’t had a chance to do any sewing. I will be really happy when I have a chance to finish the border so I can get the octagons off my wall and put something else up there.

1- As in the previous week, these are the pieces and parts for red and turquoise four patches. Ir eally need to find some more turquoise fabrics.

2- These patches are the start of the newest batch of FOTY 2014 rectangles.

3- Octagons from the Russian Rubix quilt top.

4- Finished red and turquoise four patches

5- Donation blocks, mostly finished, but one in process

6- PIQF Inspiration blocks in process

7- PIQF Inspiration blocks in in cutting stage

I am linking up with Judy Laquidara’s Patchwork Times

EPP Growing

Half Hexie Cluster
Half Hexie Cluster

My English Paper Piecing half hexie stars are growing into a giant cluster.

I forgot to rotate the photo. What I think of as the bottom is the line of stars with the dark green and Philip Jacobs flower print on the diagonal on the left.

I have some diamonds that will make the border straight. I don’t know what color I will make them, but I would like to decide and make a few to get the feel of how the piece will look. There will be no black stars, so, perhaps, black? I hoping for a look like those 1930s quilts which just have a spark of black. I’ll have to try it out and see how it will look.

I recently finished adding a whole big section, or what I thought was a whole big section and it really turned out to be about four blocks. I thought it was a larger section when I was doing it, because of the twisting of the stars that needs to take place to get them together. I think I will add one star at a time from now on.

My biggest problem is the background stars. I need to make more and keep forgetting to cut the bright white dot fabrics until I am sitting and doing it.

Design Wall Monday

Design Wall 11/3/2014
Design Wall 11/3/2014

My design wall is shockingly similar to the last time.

Fewer octagons.

Similar black and grey donation blocks.

If you zoom in, you can see the beginnings of the Modified Garden of Eden blocks I started after we went to PIQF. You have to zoom in, because all you can see are some grey triangles that are similar in color to my design wall.

I finished filling in the space for the FOTY 2014 blocks, which you will hear more about later this week.

Red and turquoise four patches are pretty much the same. I am in desperate need of some turquoise squares, which is kind of shocking since there is no shortage of turquoise in this place.

I really should do a What’s on the Design Floor, because all of my half baked projects are on the floor right now. I really have to get those octagons and the Russian Rubix out of my life.

Linking up with Judy for Design Wall Monday at Patchwork Times.

Current Projects – October 2014

The title of this post is so boring I just don’t know if I can stand it. It says what it is and you can find it easily but there is nothing interesting in it at all. 26 Projects was a lot more interesting.

I can’t believe it is October. January-Febuary-March seem like they were yesterday and now we are full on in Fall and thinking seriously about Thanksgiving and Christmas. Yes, Halloween is in there, too.

Finished 2014 Quilt Projects

  1. Disappearing Pinwheel: finished 5/30/2014
  2. Fabric of the Year 2012: finished 4/24/2014
  3. Flower Sugar Hexagon: finished 7/1/2014
  4. Fresh Fruit: finished May 3/3/2014
  5. Infinity Quilt: finished 3/3/2014
  6. Scrapitude Carnivale: finished 6/3/2014
  7. See: finished 8/11/2014
  8. Spiderweb: finished 2/22/2014 WHEW!
  9. Star Sampler: finished 7/3/2014
  10. Wonky Nine Patch – finished 9/6/2014

Finished 2014 non-Quilt Projects

Still WIPs

I still have WIPs. Who doesn’t, after all, but the list is getting a lot smaller.

  1. Aqua-Red Sampler – Frances and I haven’t really worked on this for a long time. I really want her to finish her hexagon block before we move on. I think she has progressed so much since we started that I wonder if I should just tell her how to put the quilt together and be done with it.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, I do think about it. The Lunns have a new line of PP fabric out. I am curious to see the new colors. I only saw a few at PIQF
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece, but I kind of lost steam again after printing images on paper to try out different designs. Lately, I have been feeling like I need to finish this piece as it should be a good reminder for some other stuff going on in my life. Perhaps that will spur me on.
  5. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.

Ready for Quilting

Wow! Everything on this list is new, as in it was never on the original 26 Projects list.

  1. Fabric of the Year 2013: top, back and binding made; ready to take it to the quilter
  2. New:* Super Secret Project #4: at the quilter
  3. Table runner: Basted; needs quilting and binding. I am planning on free motion quilting this myself for practice, which may be a challenge when my main machine is not working. (Not on original list)

In the Finishing Process

Nothing at this time, which is kind of odd.

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on a project that is “In Process.”

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5″x4.5″ blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2″ squares
  • FOTY 2014: cutting out 3″x5″ rectangles.
  • Pink Gradation Quilt: cutting 2.5″x4.5″ pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I just remembered this project. It isn’t started, but I have all the pre-cuts and should think about actually using them.
  • Windmill quilt: Still hunting and gathering. I will use a grey for the background, because if I use more of the cut fabric patches, the pattern will be lost. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps

Abandoned

Nothing so far for 2014

You can find the last update for the Current Projects list provides a good comparison to this month.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made REALLY GOOD progress. Up until last month, I was still planning to stop this post when I had no more projects from the original list to write about, but now, that the end is in sight, I am not so sure. It is so useful to keep track of all of my projects. Since I still have some pretty old projects on the list, I don’t have to decide right now.

*New – Project started after I started working on the 26 Projects list

What’s On The Design Wall

Design Wall September 2014
Design Wall September 2014

Again, my design wall looks remarkably similar to what I posted last time. C’est la vie. I have to remind myself that it isn’t speed that I am going for (though sometimes it isn’t true), it is engaging with the process that is important.

#1: I am still making those turquoise and red four patches. I have a lot more patches than blocks at the moment, though fewer than last time, because I did indeed get busy and made a few. I still have too many other leaders and enders at the moment to make real progress on any one quilt top.

#2: I have a few more squares finished for the Teenaged Boy Donation Quilt and some in progress as well. I dug out some more blacks and greys to add some variety. Some came from the edges of the T-shirt quilt and I thought it was a good use of that remnant.

#3: I decided to make another Owl, like Henry. I took the leftover mosaic piecing from Henry and added some more to it. I am also most out of chocolate brown so I hope the piece is large enough. I haven’t gotten the pattern out to check, but I will soon.

#4: some red and turquoise 4 patches in process. I used a few for leaders and enders, though I have enough leaders and enders to see me through nearly an eternity of projects.

#5:  those octagons are still taking up a lot of space. As you might remember, I decided I would start with the top row and sew all of the octagons in each of those colors. The goal was to get the small triangles sewn to the octagons, so the next step would be to make the blocks with a variety of colors. My idea was that once the stack on my sewing table had been sewn, I would take the octagon off the design wall and sew that, thus reducing the space being hogged on my design wall. It didn’t work. It didn’t work because partway through my grand plan I have enough blocks to make a BIG quilt and many more octagons. I have to mull over ideas, which includes putting octagons in the scrap bin or making journal covers out of them. I have a border idea that will use a bunch more so we’ll just have to see.

#6: this group of FOTY 2014 patches has also been up there a long time. I started in on the big pile of fabric that I talked about last time, finally, and made a group of patches. It is not enough yet for a full post, but I am getting there. One problem is that it was a load of neutrals and those are very depressing to press one after another. It has to be done, so after the Band Review Saturday (4:30 am start) I was too tired to sew and pressing seemed the thing.

#7: the block is still on the design wall. As I said before, I made the 9 patch, but the Young Man sewed the button to the middle in Cub Scouts as part of a rank advancement, I think. Every time I look at it a flood of emotions hits me:

  • Why doesn’t Boy Scouts have a sewing merit badge?
  • Wishes that I had sewed more with the boy when he was small and somewhat interested.

I am still trying to think of a project in which to include it.

#8: that little Art Deco-esque flower is from one of the first swaps or challenges put on by BAMQ. I thought I would use that flower as the center of something and haven’t yet gotten to it.

#9: those are some of my favorite ATCs. I keep them near my sewing machine so I can be reminded to be creative.

#10: (far left) those are finished ATCs that I have swapped with other CQFAers. I put them in those plastic name badge holders people get at conferences and hang them up. I really need a clothesline or something, but have never gotten around to it.

#11: Paper pieced Mariner’s Compass made in a Barbara Barber class. I intend to finish it. I even still have the pieces, the pattern and the directions. I suppose it should go on my To Do List.

What is on your Design Wall?

 

>>I linked up with the Patchwork Times.

Current Projects – September 2014

Finished 2014 Quilt Projects

  1. Disappearing Pinwheel: finished 5/30/2014
  2. Fabric of the Year 2012: finished 4/24/2014
  3. Flower Sugar Hexagon: finished 7/1/2014
  4. Fresh Fruit: finished May 3/3/2014
  5. Infinity Quilt: finished 3/3/2014
  6. Scrapitude Carnivale: finished 6/3/2014
  7. See: finished 8/11/2014
  8. Spiderweb: finished 2/22/2014 WHEW!
  9. Star Sampler: finished 7/3/2014
  10. Wonky Nine Patch – finished 9/6/2014

Finished 2014 non-Quilt Projects

Still WIPs

I still have WIPs. Who doesn’t, after all, but the list is getting a lot smaller.

  1. Aqua-Red Sampler – Frances and I are back at it regularly and I give Frances full credit as I have been letting her “drive the bus.” I did work on the hexagon tutorial as promised. It is ready to post, but I could have taken a few more photos and might still do that. If you look at it and think there are a paltry number of photos, check back.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, I did find a bunch of squares already made. That makes me hopeful.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece. I am working on printing images on fabric and looking at the shoulder fabric. I am still trying to decide about a mouth and I need to find some monsters. 😉
  5. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.

Ready for Quilting

Wow! Everything on this list is new, as in it was never on the original 26 Projects list.

  1. Fabric of the Year 2013: top, back and binding made; ready to take it to the quilter
  2. New:* Super Secret Project #4: at the quilter
  3. Table runner: Basted; needs quilting and binding. I am planning on free motion quilting this myself for practice, which may be a challenge when my main machine is not working. (Not on original list)

In the Finishing Process

Nothing at this time, which is kind of odd.

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on a project that is “In Process.”

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5″x4.5″ blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2″ squares
  • FOTY 2014: cutting out 3″x5″ rectangles.
  • Pink Gradation Quilt: cutting 2.5″x4.5″ pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I just remembered this project. It isn’t started, but I have all the pre-cuts and should think about actually using them.
  • Windmill quilt: Still hunting and gathering. I will use a grey for the background, because if I use more of the cut fabric patches, the pattern will be lost. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps

Abandoned

Nothing so far for 2014

You can find the last update for the Current Projects list provides a good comparison to this month.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made REALLY GOOD progress. Up until last month, I was still planning to stop this post when I had no more projects from the original list to write about, but now, that the end is in sight, I am not so sure. It is so useful to keep track of all of my projects. Since I still have some pretty old projects on the list, I don’t have to decide right now.

*New – Project started after I started working on the 26 Projects list

Current Projects – August 2014

Finished 2014 Quilt Projects

  1. Disappearing Pinwheel: Finished 5/30/2014
  2. Fabric of the Year 2012: Finished 4/24/2014
  3. Flower Sugar Hexagon: Finished 7/1/2014
  4. Fresh Fruit: Finished May 3/3/2014
  5. Infinity Quilt: Finished 3/3/2014
  6. Scrapitude Carnivale: Finished 6/3/2014
  7. See: Finished 8/11/2014
  8. Spiderweb: Finished 2/22/2014 WHEW!
  9. Star Sampler: Finished 7/3/2014

Finished 2014 non-Quilt Projects

Still WIPs

  1. Aqua-Red Sampler – Frances and I are back at it regularly and I give Frances full credit as I have been letting her “drive the bus.” I did work on the hexagon tutorial as promised. It is ready to post, but I could have taken a few more photos and might still do that. If you look at it and think there are a paltry number of photos, check back.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, I did find a bunch of squares already made. That makes me hopeful.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece. I am working on printing images on fabric and looking at the shoulder fabric. I am still trying to decide about a mouth and I need to find some monsters. 😉
  5. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.

Ready for Quilting

Wow! Everything on this list is new.

  1. New:* Wonky 9 Patch: Basted; started quilting on 8/21. All orange blocks done and working on plain blue blocks, needs binding. (Not on original list)
  2. New:* Super Secret Project #4: at the quilter
  3. Table runner: Basted; needs quilting and binding. I am planning on free motion quilting this myself for practice, which may be a challenge when my main machine is not working. (Not on original list)

In the Finishing Process

Nothing at this time, which is kind of odd.

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on a project that is “In Process.”

Hunting and Gathering

  • Blue Gradation Quilt: cutting 2.5″x4.5″ blue rectangles
  • Blue Lemonade: cutting blue, green, purple 2″ squares
  • FOTY 2014: cutting out 3″x5″ rectangles.
  • Pink Gradation Quilt: cutting 2.5″x4.5″ pink rectangles
  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I just remembered this project. It isn’t started, but I have all the pre-cuts and should think about actually using them.
  • Windmill quilt: Still hunting and gathering. I will use a grey for the background, because if I use more of the cut fabric patches, the pattern will be lost. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps

Abandoned

Nothing so far for 2014

You can find the last update for the Current Projects list provides a good comparison to this month.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made REALLY GOOD progress. Up until last month, I was still planning to stop this post when I had no more projects from the original list to write about, but now, that the end is in sight, I am not so sure. It is so useful to keep track of all of my projects. Since I still have some pretty old projects on the list, I don’t have to decide right now.

*New – Project started after I started working on the 26 Projects list

Design Wall Monday

Design Wall -Friday
Design Wall -Friday

I decided to join in the Design Wall Monday posts that people write and discuss. Why not?

My design wall looks remarkably similar to the last time I posted about my design wall. I did note that I have made progress. Though we had some things to do this weekend,  I decided to make progress, thus the two photos – before and after. The Before photo was taken Saturday morning about 8:45 and I snapped (HA!) the After photo yesterday in the late afternoon.

I can’t discuss every little detail of everything on my design wall, but there are a few things. First, deciding to make progress meant that I had to actually clean up my sewing room. Horizontal surfaces were stacked with stuff, so I had to clean those off on Friday. That led to me taking photos of projects in process. I finally had a chance to lay things out.

Each of the areas are numbered, so you will see the numbers in parentheses below.

Second, (#3) those octagons are taking up a lot of space, so I decided I would start with the top row and sew all of the octagons in each of those colors until I had sewn the triangles on to each color. Once the stack on my sewing table had been sewn, I would take the octagon off the design wall and sew that. As I took them off, I would have more space on the wall.

Third, (#1) the FOTY 2014 patches had been up there a long time. I have a big pile of fabric to press, so I pressed some of that on Friday in order to fill in the group of patches,

Next, (#4) those Russian Rubix blocks had been on the all for a long time. There were pieces and parts of others on my sewing table, so those were sewn pretty early.

Fifth, (#5) I had pieces and parts of the black/grey donation blocks so I sewed those together as well.

Sixth, (#6) That Stars in Stripes 8 pointed star got very close to being made. I have to unearth the templates or rotary cutting directions for the background, so close, but no cigar.

Seventh, (#2) I am still making those turquoise and red four patches. I have a lot more patches than four patches at the moment and need to get busy. Too many other leaders and enders right at the moments.

Eighth, (#7) I made the 9 patch, but the Young Man sewed the button to the middle in Cub Scouts. I am still trying to think of a project in which to include it.

Last, (#8) those are some of my favorite ATCs. I keep them near my sewing machine so I can be reminded to be creative.

Design Wall - Sunday
Design Wall – Sunday

After sewing, truly, like a maniac, on and off all weekend I did make some progress.

The four patches didn’t change except that I thought about sewing them.

I took the late July/ early August batch of FOTY patches off the wall and started pressing and cutting a new batch. The ones you see on the wall happen to be Field Day.

I finished a few of the Russian Rubix colors from the top row. The last purple/violet (on the wall on the right) is a bear to get through. I cut extra octagons, so I am sewing for a long time to get through them. Clearly I was afraid someone would steal that fabric in that colorway and I wanted to have plenty. In between I have been sewing other colors as well, so there is some variety in the new blocks.

Since I had so many new quarter blocks for the Russian Rubix, I started laying out new blocks.

That 8 pointed star is still there, as you can see. It is, really, getting closer to the top of the list.

What do you think about my progress?

What’s on your design wall?

I linked up here: Judy Laquidera’s Patchwork Times

See Drama

See - All Wrong
See – All Wrong

I spent last Saturday making the facing for See. I merrily cut strips (straight of grain), pressed hems and sewed. The whole process was going so well!

I put all the facing strips on to the piece and was about to press them all to the other side, when I realized, as you can see from the photo, that I had sewed them to the wrong side.

Sigh.

I ripped out all of the stitching, which wasn’t hard, but, apparently, required lots of sighing. What an idiot. Finally, I was done and sewed all the pieces to the front. I made a few adjustments that I was only able to do because I had noticed them while I was ripping.

See - Facing on Correct Side
See – Facing on Correct Side

The photo shows the facing before I pressed it to the back. Hopefully you can see two important things:

  1. the sides of the facing do not go all the way to the edge of the side – this is to minimize bulk in the corners
  2. the sides of the facing are on top – this is so that the top and bottom facing strips can encase the side strips and make a nice finished edge.

After I pressed the facing to the correct side (front to back), I made a tiny sleeve. I have been stitching away on the facing while watching TV. I have all but a few inches of the facing sewn on. The sleeve comes next. I hope to finish soon.

Previous Posts

More Progress on See

See - finished quilting
See – finished quilting

Well, I finally finished the quilting on See.

I find that once I get started on the quilting of a piece I stay and quilt until I can’t move. Not being able to move is a bad thing.

Still the quilting is done on this piece! After so many years of not working on it, I finished the quilting.

This does not, as you can see, mean the piece is done, but I am so much farther along. The quilting is really a block for me. The quilting hangs me up.

Perhaps I’ll consider this a turning point?

One of the biggest problems with a project lingering so long is I forget the details.  Did I use up all the background fabric? Is there anymore left? If so, where is it? What did I plan for the facing? Did I start a label? Sometimes these are important details and another good reason to work steadily on one project (and I don’t mean ONLY one project) and not let it languish.

 

Previous Posts

Current Projects – July 2014

Finished 2014 Quilt Projects

  1. Disappearing Pinwheel: Finished 5/30/2014
  2. Fabric of the Year 2012: Finished 4/24/2014
  3. Flower Sugar Hexagon: Finished 7/1/2014
  4. Fresh Fruit: Finished May 3/3/2014
  5. Infinity Quilt: Finished 3/3/2014
  6. Scrapitude Carnivale: Finished 6/3/2014
  7. Spiderweb: Finished 2/22/2014 WHEW!
  8. Star Sampler: Finished 7/3/2014

Finished 2014 non-Quilt Projects

Still WIPs

  1. Aqua-Red Sampler – Frances and I are back at it regularly and I give Frances full credit as I have been letting her “drive the bus.” I did work on the hexagon tutorial as promised. It is ready to post, but I could have taken a few more photos and might still do that. If you look at it and think there are a paltry number of photos, check back.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, I did find a bunch of squares already made. That makes me hopeful.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. My career counselor breathed new life into this project for me. She asked a simple question and the end result was inspiration for this piece. I am working on printing images on fabric and looking at the shoulder fabric. I am still trying to decide about a mouth and I need to find some monsters. 😉
  5. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.

Ready for Quilting

Wow! Everything on this list is new.

  1. New:* Wonky 9 Patch: Basted; needs quilting and binding. I am planning on quilting this myself. (Not on original list)
  2. New:* Super Secret Project #4: at the quilter
  3. Table runner: needs quilting and binding. I am planning on quilting this myself. (Not on original list)

In the Finishing Process

  1. See: I finished the quilting! YAY!! Needs facing and sleeve

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on a project that is “In Process.”

Hunting and Gathering

  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I will use a grey for the background, because if I use more of the cut fabric patches, the pattern will be lost. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Stepping Stones #3 using the Macaron pre-cuts from Hoffman. I just remembered this project. It isn’t started, but I have all the pre-cuts and should think about actually using them.
  • FOTY 2014: cutting out 3″x5″ rectangles.

Abandoned

Nothing so far for 2014

You can find the last update for the Current Projects list provides a good comparison to this month.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made REALLY GOOD progress. Up until last month, I was still planning to stop this post when I had no more projects from the original list to write about, but now, that the end is in sight, I am not so sure. It is so useful to keep track of all of my projects. Since I still have some pretty old projects on the list, I don’t have to decide right now.

*New – Project started after I started working on the 26 Projects list

See Progress

See: Quilting the Background
See: Quilting the Background

I also, after working on the lanyard and the lovey blocks and the Fish Postcard that I got back to See. I spent about 6 hours quilting and saw a lot of progress. The background isn’t done, but I probably have a quarter of it left to stitch.

I am following the grid lines on the fuchsia fabric. It is going well, though I am starting to sink a lot of threads. the piece will be pretty tightly quilted when I am finished.

I was in a phone meeting the other day and was looking at this piece as I listened to everyone talk. I am really pleased with how the background quilting is coming out. I need to get to work to finish the piece.

EPP Stars Go Together

image
EPP Stars (back)

I have been working on my Half Hexie English Paper Pieced Stars since August of 2012. I really wanted to see if I could actually take out the paper templates and use them again. I sewed four stars together and went from there.

I would have felt a lot better if TFQ were sitting with me supporting me (egging me on). She wasn’t and I needed a stiff upper lip.

image
EPP Stars with Papers

I did it. I took out the papers and the piece is fine. I was kind of shocked at how easy it was and how well it worked. It is tempting to take them all out, but I know I can only take out those that are surrounded on all sides by another piece.

I should have been, but I was a little surprised by how well the ‘free’ pieces kept their shape.

I don’t know how many stars I have completed, but I may pull out the box in which I keep them and start sewing them together. I would at least get an idea of how many more I need. I could also start putting a border on, once I decide what fabric to use for a border.
image

image

Current Projects – June 2014

Six quilts finished this year already! Not the same as last year, but respectable.

As I look at these lists, I can hardly believe that some of the projects, which I now think of as old, were not even on the first list I made. Crazy.

Finished 2014 Quilt Projects

  1. Disappearing Pinwheel: Finished May 30, 2014
  2. Fabric of the Year 2012: Finished 4/24/2014
  3. Fresh Fruit: Finished May 3/3/2014
  4. Infinity Quilt: Finished 3/3/2014
  5. Scrapitude: Finished 6/3/2014
  6. Spiderweb: Finished 2/22/2014 WHEW!

Finished 2014 non-Quilt Projects

Still WIPs

  1. Aqua-Red Sampler – Frances and I are back at it regularly and I give Frances full credit as I have been letting her “drive the bus.” I did work on the hexagon tutorial as promised. It is ready to post, but I could have taken a few more photos and might still do that. If you look at it and think there are a paltry number of photos, check back.
  2. The Tarts Come to Tea: I still haven’t worked on this since April 2011, though, periodically, I think about working on it.
  3. Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. I still haven’t worked on this, though, I did find a bunch of squares already made. That makes me hopeful.
  4. Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I like the piece, but don’t know where to go from where I am. Mouth? Hair? The attitude I need to have is that I can’t ruin it; there is always more fabric. Possibility for abandonment.
  5. Under the Sea: class project; like the design, but not the colors much. Possibility for abandonment. I have to face reality.

Ready for Quilting

Wow! Everything on this list is new.

  1. New:* Wonky 9 Patch: needs quilting and binding. I got some batting from Kelly for this since I am thinking about quilting this myself. (Not on original list)
  2. New:* Super Secret Project #4: at the quilter

In the Finishing Process

  1. See: I have quilted about a third of it, so 2/3 needs to be quilted. Needs facing and sleeve
  2. Flower Sugar Hexagon / Attack of the Hexies – Sewing on binding.
  3. New:*Star Sampler: Quilting finished and binding machine sewed on the front. I have to go pick it up and sew the binding down by hand (not on original list)

In Process
I decided that I had better put in an ‘In Process’ category. The difference, at least in my mind, between ‘In Process’ and ‘UFO’ is that I am actively working on a project that is “In Process.”

Hunting and Gathering

  • Spin Wheel: really not started, but supplies gathered. I probably have enough fabrics and just need to decide to start.
  • Windmill quilt: Still hunting and gathering. I will use a grey for the background, because if I use more of the cut fabric patches, the pattern will be lost. The pieces are too oddly shaped and I don’t want to lose the pattern in a mass of scraps.
  • Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
  • Super Secret Project #3: working on color choices.
  • FOTY 2014: cutting out 3″x5″ rectangles.

Abandoned

Nothing so far for 2014

You can find the last update for the Current Projects list provides a good comparison to this month.

I thought you might want to take a look at the first list I made, the one with the 26 Projects. I started the list in October 2011. I have made REALLY GOOD progress. Up until last month, I was still planning to stop this post when I had no more projects from the original list to write about, but now, that the end is in sight, I am not so sure. It is so useful to keep track of all of my projects. Since I still have some pretty old projects on the list, I don’t have to decide right now.

*New – Project started after I started working on the 26 Projects list