October To Do List

Yes, this is the week of lists.

To Do List:

  1. Quilt Christmas table runner
  2. Wash fabric AKA The Great Unwashed-I washed more loads in September. I washed all the fabric I bought during the Great College Travel Adventure and have used a number of piece. Now I have a huge pile of the Great Unironed
  3. Make stiff bucket or box for TP in main bath
  4. Anna Maria Horner Multi-tasker tote (gift-due Holiday 2013- sigh. Missed 2014 deadline as well)
  5. Cut out 3 notepad covers for gifts
  6. Finish cutting out Day in the Park backpack variation
  7. Finish cutting out 3rd Petrillo bag
  8. Sew Bon Appetit apron
  9. Fix button on DH’s California shirt – he decided it was fine
  10. Art supplies Sew Together Bag
  11. Art supplies pincushion
  12. Purple Sew Together Bag
  13. Purple pincushion
  14. **More Christmas Pillowcases
  15. **Thanksgiving tablerunner #1
  16. **Thanksgiving tablerunner #2
  17. **Thanksgiving tablerunner #3
  18. **Thanksgiving table mat
  19. **ATCs for CQFA October meeting

To see the 26 Projects Lists, which list quilt WIPS, visit the October 26 Projects update. August’s To Do List has a couple of changes, which is heartening.

**New this time

Done in 2015:

  • Make stiff bucket or box for TP in second bath
  • Christmas pillowcases
  • ATCs for CQFA April Meeting
  • 3 Christmas pillowcases (from May list)
  • ATCs for CQFA January Meeting
  • Make binding for Pink T Quilt
  • Make two bags for gifts (January list)

 

Author: Jaye

Quiltmaker who enjoys writing and frozen chocolate covered bananas.

One thought on “October To Do List”

  1. I like how you refer to your new fabric as the Great Unwashed and Great Unironed. I have a big stack of unironed fabric waiting for ironing. Its been put in the closet until I get to the point in my sewing where I feel I should iron the fabric that I need. I often place the basket of unironed fabric in the closet and close the doors so I don’t feel like the sewing room is so messy.

Comments are closed.