![La Pass M2 WIP](https://artquiltmaker.com/blog/wp-content/uploads/2021/10/20211007_170332_wm-sm-292x300.jpg)
Month two’s work is getting done. Not as fast as I would like, especially since I already received Month 3. I have to keep reminding myself it is not a race. As I have said before I just don’t want to fall behind. And I am making progress. I posted about my M2 work the other day and you can see that I have made progress since then.
Everything outside the black circle is Month 2. In this picture you can see the various chunks laid out next to the Rosette #1 with only some (mostly on the left) sewn down.