This list is really funny. I want to scratch items off of it, but I don’t want to rush through them either. I find that, now, I pick up a project and intensely work on it until it is finished. Any projects on this list are projects I have decided I want to work on. At least I want to work on them at the moment. If I decide I don’t want to work on them anymore, I will abandon them.
Here is the list, again, still in no particular order, except that I have put some of the “mostly finished” projects at the end. This time, like last, I have moved the finished pieces off. Still 23 WIPs left, because I added the Wonky 9 patch. Darn you inspiration!
- Original Bullseye: needs border, backing, quilting and binding, which are all hard to do if you can’t find the project. It is lost. I know it is in there somewhere. As I mentioned, I did a test and found that my original idea didn’t work. I think a plain border will set off the blocks fine IF I ever find the top. Bleah!
- Corner Store: All blocks are made (an additional 11 were made on 6/17). I have now sewn all the blocks together in groups of 4. On 6/17, I also started sewing the groups of 4 to each other.
- Spin Wheel: really not started, but supplies gathered. Cutting fabrics as I go
- Infinity blocks: Am starting to think this would make a good nephew quilt.
- A-B-C (A-Z) BAMQG Challenge – I am actually not sure if this should be considered a WIP (Please say no!), because I just barely have enough blocks with which to make something. I am making good progress. I have S and T blocks on my mind. I am really thinking about just making all the blocks, putting sashing around them and then trimming the sashing a bit so the blocks are all a uniform size. They are not wildly off, but they are a bit off… I could bring them to BAMQG as the blocks are due. We’ll see.
- Aqua-Red Sampler – steady progress has stopped and the class more than the quilt is really weighing on my mind. As far as I know Frances has finished her Dresden Plate, so perhaps we will start up again soon. The next class was going to be fusible machine applique’, but I haven’t gotten past cutting out the templates. Perhaps I should skip to machine piecing curves?
- The Tarts Come to Tea: I haven’t quilted on this since April 2011. I need to work on the quilting. I was making good progress and then got sidetracked. I have been quilting another quilt and that is getting me back in the swing of quilting. Now that my machine is happier, perhaps it is a good time to take this piece out again? I would like to finish it.
- Garden: I started this piece in a class with Pamela Allen in 2006. As mentioned, I used this piece for my beading demo for the 2012 EBHQ Voices in Cloth show (March 17), which means that I added some beads. I started on the machine quilting late in April and am almost finished with the background. I was kind of stuck on the flower petals, but may FMQ them now that my machine is feeling better.
- Flower Garden: I still find the ‘flowers’ too spiky. I think I need to soften them up a bit.
- Moon and Stars: need to finish hand quilting. This quilt is not interesting. This is month 2 that I have thought this is a candidate for abandonment.
- Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. Good leaders and enders project. I wonder if I cut the squares accurately?
- See: needs satin stitching.
- Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I like the piece, but don’t know where to go from where I am. Mouth? Hair?
- Spiderweb: need to make sure that I have the right number of blocks for the size quilt I want to make. Need to make sure I have the border pattern and start sewing border blocks.
- Under the Sea: class project; like the design, but not the colors much.
- Flower Sugar Hexagon: sewed more hexagons together. Sewing Y seams is a bit of a chore, so I get tired of doing it after awhile.
- Young Man’s t-shirt quilt: have cut up the t-shirts and am still in the process of applying fusible. He cleaned out his drawers and found some more t-shirts to add to the quilt. Oh Yay! <– just a bit of sarcasm
New: Super Secret Project: top, back and binding made. Ready to go to the quilter. Stayed tuned.FOTY 2011: at the quilter, needs binding.Flowering Snowball: Top and back finished 5/13/2012; ready to go to the quilterStepping Stones: at the quilter, made binding, which she will sew on for me and then I need to hand sew.Jelly Roll Race: at the quilter. Needs binding, quilting, sleeve.Wonky 9 Patch: needs quilting and binding.
Finished or Abandoned projects that were on the list:
- Stars for San Bruno #2: Finished! YAY!
- Pavers. Finished! YAY!
- Kissy Fish: Finished! Yay!
- Pineapple: Abandoned; will remake blocks at a later time with more care.
- Stars for San Bruno #3: Finished! YAY!
- Food Quilt: Finished 5/24/2012. YAY!!!!