Finished 2013 Projects:
- Corner Store: Finished on 1/1/2013 YAY!
- The Garden. Finished on 1/5/2013 YAY!
- Stepping Stones: Finished on 2/14/2013 YAY!
- Fabric of the Year 2011: Finished on 2/27/2013 YAY
- Calm: Finished on 3/14/2013 YAY!
I still think the next projects on the list will be harder, especially since I haven’t worked on them, except for the Aqua-Red Sampler. They are older, in some cases, or VERY unfinished. I am still hopeful.
Still WIPs
- Aqua-Red Sampler – Frances is working diligently and I started the foundation piecing tutorial.
- The Tarts Come to Tea: I still haven’t worked on this since April 2011, though I did think about working on it. Does that count for something? I really do need to get back to the quilting. I am mad at myself for making such good progress and then getting sidetracked. I thought quilting the Whole Cloth quilt would get me back in the swing of quilting, but apparently not.
- Pointillist Palette #4: Fourth is a series of 6 quilts; needs tiny square patches sewn together. Mrs. K. gave me more PP fabric and I won some from a giveaway. I still think it is a sign that I need to work on this. Leaders and enders.
- See: needs satin stitching. Small, also a possibility for finishing. I really have the feeling I came so close to working on this project this month.
- Self Portrait: started in 2006 at a class at Quilting Adventures in Richmond, Virginia. I like the piece, but don’t know where to go from where I am. Mouth? Hair? The attitude I need to have is that I can’t ruin it; there is always more fabric.
- Under the Sea: class project; like the design, but not the colors much.
- Flower Sugar Hexagon: I thought about sewing more hexagons together. Although not difficult, sewing Y seams is a bit of a chore, so I get tired of doing it after awhile. I could, perhaps, use leaders and enders to get this piece moving?
- Young Man’s t-shirt quilt: have cut up the t-shirts and am still in the process of applying fusible. He cleaned out his drawers and found some more t-shirts to add to the quilt. Oh Yay! <– just a bit of sarcasm. He asked me again for another quilt, so I think this one is next in line. I plugged in his heating mattress pad, though, which should keep him quiet for a bit longer.
- New: FOTY 2012: top, finished, though I can’t decide if I need a quilting border. Working on the back.
I still have a few more WIPs than I do finished projects. Again, I have made progress on clearing out old projects and I am pleased.
Ready for Quilting
- Original Bullseye: At the quilter
- New: Wonky 9 Patch: needs basting, quilting and binding. Not on original list
- New:* Super Secret Project #2: At the quilter. Not on original list
- New: Super Secret Project: At the quilter. Stay tuned.
Not on original list
- Infinity blocks: blocks sewn together into a quilt top, borders on. Back and binding made; ready to be quilted.
- A-B-C (A-Z) BAMQG Challenge –At the quilter. Due April 1.
- New: Sparkle Pink – At the quilter.
- New: Swoon – At the quilter.
- Spiderweb: Top is together, binding is made. This is at the quilter.
Please note that even if you combine the two lists above, I do not have 26 projects on this list anymore. That is something, IMO.
In the Finishing Process
Abandoned
Nothing so far for 2013
Hunting and Gathering
- Spin Wheel: really not started, but supplies gathered. Cutting fabrics as I go. TFQ does not consider this a UFO and made some good points to that end, which is why I have moved it to the Hunting and Gathering section. She says, and I have to agree, that quilts are not ‘projects’ until the sewing starts. OK. I’ll go with that.
- Windmill quilt: Still hunting and gathering.
- Stepping Stones #2 using Bonnie & Camille fabrics Bliss, Ruby, Vintage Modern: made two test blocks, but still in the thinking stage while I decide on the background colors. I want the contrast to be good.
As I mentioned, I am still trying to think of a new focus for this list for 2013. I feel that I made progress on the most ancient and difficult projects and I want to honor that. I won’t give up working on the projects on this list, but I also will not allow the list to prevent me from starting new projects in 2013. What else?
Last update for the 26 Projects List
*New – Project started after I started working on the 26 Projects list
Oh it looks like you have plenty of UFO entries to come Jaye, LOL. You have been so productive already this year and we’re only 3 months in! Good work.
Oh definitely plenty. Many of them are at the quilter and she is working on one a month to me. I have Calm to add the UFO along. I just keep forgetting when I am at home. I need to remember before the next deadline!